| 1 | Cartage of following PCC/ST poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | Cartage of following PCC/ST poles Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). |
| 2 | PCC poles 8.5 Mtr. | PCC poles 8.5 Mtr. |
| 3 | PCC poles 9 Mtr. | PCC poles 9 Mtr. |
| 4 | ST pole. | ST pole. |
| 5 | Cartage of line material viz Weasal / DOG Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | Cartage of line material viz Weasal / DOG Conductor, GI earth wire, Cross Arm, Angle, Channel, Insulator, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). |
| 6 | Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | Erection of single support including complete H.T/L.T fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 7 | PCC poles 8.5 Mtr. | PCC poles 8.5 Mtr. |
| 8 | PCC poles 9 Mtr. | PCC poles 9 Mtr. |
| 9 | ST pole. | ST pole. |
| 10 | Dismentling of old and damaged double pole after dismentling of all accessories. | Dismentling of old and damaged double pole after dismentling of all accessories. |
| 11 | 33 KV line double pole | 33 KV line double pole |
| 12 | 11 KV line double pole | 11 KV line double pole |
| 13 | Erection of double pole on PCC pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. | Erection of double pole on PCC pole including the work of complete line as per RESPO norm manual and as per direction of Engineer Incharge including the cost of labour, T & P and carrier etc. required for proper completion of work. |
| 14 | 33 KV line double pole | 33 KV line double pole |
| 15 | 11 KV line double pole | 11 KV line double pole |
| 16 | Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work. | Re-sagging of loose HT/LT line conductor as per direction of supervising engineer. It includes the cost of labour T&P carrier etc. required for proper completion of work. |
| 17 | ACSR Weasol Condutor | ACSR Weasol Condutor |
| 18 | DOG Conductor | DOG Conductor |
| 19 | Retighting of stay complete with nozelling & binding including cost of labour T&P etc required for proper completion of work. | Retighting of stay complete with nozelling & binding including cost of labour T&P etc required for proper completion of work. |
| 20 | Straightening of tilted PCC/ST poles at various places as per direction of JE. | Straightening of tilted PCC/ST poles at various places as per direction of JE. |
| 21 | Replacement of following damaged accessories:- | Replacement of following damaged accessories:- |
| 22 | 11 KV Disc Insulator | 11 KV Disc Insulator |
| 23 | 11 KV Pin Insulator | 11 KV Pin Insulator |
| 24 | 11 KV V-type Cross Arm | 11 KV V-type Cross Arm |
| 25 | 33 KV Disc Insulator | 33 KV Disc Insulator |
| 26 | 33 KV Pin Insulator | 33 KV Pin Insulator |
| 27 | 33 KV V-type Cross Arm | 33 KV V-type Cross Arm |
| 28 | F-Bracket | F-Bracket |
| 29 | Drilling and cutting of tee off channel, top channel, dropper channel, cross bracing angle, MS garding angle as per specification of UPPCL construction manual including loading and unloading at the both ends. | Drilling and cutting of tee off channel, top channel, dropper channel, cross bracing angle, MS garding angle as per specification of UPPCL construction manual including loading and unloading at the both ends. |
| 30 | Grouting of PCC poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size 1500x450x450 mm). | Grouting of PCC poles as per RESPO norms including cost of grouting material (cement: sand: brick ballast) size 1500x450x450 mm). |
| 31 | Chopping & cutting of big tree branches which are touching to 11 KV/LT/HT lines very small branches will not be counted for this purpose. | Chopping & cutting of big tree branches which are touching to 11 KV/LT/HT lines very small branches will not be counted for this purpose. |
| 32 | Re-Sagging of aerial bunched cable of following sizes after dismentling of damaged pole including fixing of all accessories:- | Re-Sagging of aerial bunched cable of following sizes after dismentling of damaged pole including fixing of all accessories:- |
| 33 | ABC 3x120+1x95+1x16 sq.mm | ABC 3x120+1x95+1x16 sq.mm |
| 34 | ABC 3x95+1x70+1x16 sq.mm | ABC 3x95+1x70+1x16 sq.mm |
| 35 | ABC 3x50+1x35+1x16 sq.mm | ABC 3x50+1x35+1x16 sq.mm |
| 36 | Laying sagging stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. | Laying sagging stringing, binding and jumpering etc. of old line conductor on the newly erected pole as per RESPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T&P carrier etc. required for proper completion of work. |
| 37 | ACSR Weasel Conductor | ACSR Weasel Conductor |
| 38 | ACSR Rabbit Conductor | ACSR Rabbit Conductor |
| 39 | ACSR Raccoon Conductor | ACSR Raccoon Conductor |
| 40 | ACSR DOG Conductor | ACSR DOG Conductor |
| 41 | Dismantling and removel of existing conductor from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. | Dismantling and removel of existing conductor from the various area preparing their coils and then stacking in the respective JE’s (Store) as per direction of Supervising Engineer. It includes the work of cartage, cost of labour, T&P carrier etc. required for proper completion of work. |
| 42 | Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. | Guarding of old 11 KV line damaged due to storm by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 Mtr. as per RESPO manual and also including the cost of arragement of labour, T & P etc. required for proper completion of work. |
| 43 | Demounting & installation of following capacity transformer due to damage of PCC poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work including its jumpering with HT and LT line side. | Demounting & installation of following capacity transformer due to damage of PCC poles in storm including the work of its loading & unloading, dragging etc. and also including the cost of labour and T&P etc. required for proper completion of work including its jumpering with HT and LT line side. |
| 44 | 10/16 KVA T/F | 10/16 KVA T/F |
| 45 | 25 KVA T/F | 25 KVA T/F |
| 46 | 63 KVA T/F | 63 KVA T/F |
| 47 | 100 KVA T/F | 100 KVA T/F |