|
| 1 | Construction of embankment with approved material obtained from barrow pits with a lift upto 1.5 m, tranporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000m as per Technical Specification clause 301.5 |
| 2 | Excavation in foundation in ordinary soil, loame, clay or sand inculuding lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30mfrom the foundation trenches. SI. No. 251. |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. |
| 4 | WBM Grading III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 with 22.4 - 53 mm stone ballast as per Technical Specification Clause 405) |
| 5 | Concrete with the 4 cm guage B/Ballast,Fine Local sandof 1.25 F.M and cement in proportion of 12:6:1 in under floor including supply of all materialand T&P etc. as P.W.D S.I. No 273 |
| 6 | First class brick work in 1:4 cement and coarse sand mortar in foundation and plinth including supply of all material, labour, T&P etc. required for proper completion of work.as per SINo. 305 |
| 7 | Cement concrete with 2cm (3/4'') gauge approved stone ballast, approved coarse sand and cement in the proportion of 3:1.5:1 including supply of all materials labour and T & P etc required for proper completion of the work as item no. 279(ii) |
| 8 | Providing and laying of factory made 80 mm thick Interlocking cement concrete tiles (30 mpa) including 25mm thick compacted bed of fine sand compacting and proper embedding/ laying of interlocking tiles leveling and dressing of surface to required level and slope, filling joints with fine sand including the cost of material, labour T&P etc. required for proper completion of work as directed by engineer-in charge.as per NEW ITEM NO.1 |
| 9 | 12 m.m. thick Plaster with Cement mortar consisting of one part of cement and 4 part of coarse sand of 2.25 FM on brick work including supply of all material, labour, T&P etc.S.I No 584(i). |
| 10 | R.C.C. work with cement approved coarse sand and 2cm (3/4\\") guage approved stone grit in the proportion of 1:2:4 in lintel of doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T&P etc. required for proper completion of the work. as per SI No.283 |
| 11 | M.S. work in plain work such as RCC work including cutting and bending of bars in required shape and size as per SI No.504 |
| 12 | S/F of informatory sign board.........i/c painting,writing & fixing at site.... Complete. Please Enable Macros to View BoQ information |