| 1 | Oiling greasing of hoisting gear boxes (for rope drum and chain hoist) of dam /barrage gates and head regulator gates of dam/barrages by cleaning, checking, greasing /lubricating the gears, plummer bocks, bearings, manual drive etc including all charges of man & materials which include oiling, greasing, refilling of gear oil excluding supply of gear oil and grease and fixing of damaged oil seals & missing nut & bolts etc complete as per direction of EIC.( Gear oil & Grease provided extra.) |
| 2 | a) Width of Gate shutter size upto 9 metre |
| 3 | Oiling greasing of the load roller and guide roller assembly of the barrage/dam gate and head regulator gates of dam/barragesby cleaning, checking, greasing /lubricating etcincluding all charges of man & materials which include refilling of grease excluding supply of grease and fixing of damaged oil seals & missing nut & bolts, scafolding charges etc to complete the job as per direction of EIC. ( Mobil oil & Grease provided extra.) |
| 4 | a) Width of Gate shutter size upto 9 metre |
| 5 | Scraping, cleaning of wire rope, rope drum, pulley and lubricating the wire rope with rope compound servo coat-140 or approved wire rope compound including setting the wire rope in proper alignment and position as necessary as per direction of EIC. The Cost includes cost of manpower employed, scaffolding charges, cost of kerosine, jute, wire brush, cloth, wire rope compound & all other incidental charges to complete the job in all respect |
| 6 | d)18 mm diameter |
| 7 | Servicing of headstock assembly i.e. opening the hand wheel from screw rod, including opening the thrust bearing from top and bottom thrust plate of bearing housing, nut, coller etc and cleaning all the components with the help of Kerosine and emery paper and re-fitting the same including changing necessary nuts & bolt after greasing the thrust bearing if Ok otherwise replaced by new one (excluding the cost of bearing, supplied separately) and fileing work if required for fixing to the pedestal upto the satisfaction of E.I.C. The cost includes cost of materials, man power employed, kerosene, grease, consumables like emery paper, cloths, blots & nuts, hire chargesof tools & tackles etc. |
| 8 | Oiling greasing of headstock assembly (for screw hoist system) of regulator gates of canal/ river by cleaning, checking, greasing, screw rod, G.M nut, Thrust bearing, guide channel, etc including all charges of man & materials which include refilling of gear oil, oiling, greasing and fixing of missing nut & bolts & oil seals etc to complete the job as per direction of EIC |
| 9 | Supply of Gear Oil as per direction of Engineer in charges |
| 10 | Supply of Grease |
| 11 | Supply of Mobil Oil |
| 12 | Supply, installation, testing and commisioningof following items for hoisting system and gear box as mentioned below asper direction including cost of Materials,Machinaries , Manpower, Cutting, Machining, Aligning, Anchoring, Welding, Finishing, Consumables, Carriage and all overheads with all lead sand lifts complete asper specification (without painting) |
| 13 | Supply of brake shoe assembly for following sizes of AC Solenoid brake .a)Drum size 4\\", (make BCH or eqv. ) |
| 14 | Manual operating mechanisma.chain Please Enable Macros to View BoQ information |