| 1 | Excavation in trenches not exc 1.5m width and not exc 1.5 m in depth and getting out for laying of pipes etc in soft/loose soil . |
| 2 | Returning filling in including spreading levelling watering and ramming in layers not exceeding 25 cm in any type of soil. |
| 3 | Removing excavated surplus soil to a distance not exceeding 50M where directed and at a level not exceeding 1.5 M above the starting point. |
| 4 | M & L for taking up cast iron (CI) / DI /GI water mains (including all fittings), with spigot and socket ends and lead joints of any size all as specified and dirercted by Engr-in-Charge of following of 200 mm bore. |
| 5 | Supply and lay sewage treated water DI pipe centrifugally cast of class K-7 with spigot and socket ends/flanged end suitable for tyton joints/flanged joints including rubber gasket/rubber ring and other accessories like nut-bolts etc for the following sizes : 200 mm bore. |
| 6 | M & L for taking up cast iron (CI) / DI /GI water mains (including all fittings), with spigot and socket ends and lead joints of any size all as specified and dirercted by Engr-in-Charge of following of 250 mm bore. |
| 7 | Supply and lay sewage treated water DI pipe centrifugally cast of class K-7 with spigot and socket ends/flanged end suitable for tyton joints/flanged joints including rubber gasket/rubber ring and other accessories like nut-bolts etc for the following sizes : 250 mm bore. |
| 8 | Material and labour for fixing DI specials such as bends(any type, radius and angle),tappers any type, (straight, bend, increasing, decreasing or double socket etc) tee pieces single branch, 'Y' junction, double branch, cross (all sockets or socket and spigot) collars, caps & plugs of sizes :-Above 150 mm bore. |
| 9 | Supply and Fixing for DI sluice valve of following sizes of bore PN-1.6 incl new rubber gasket, nuts and bolts, stainless steel spindle etc including dismantling of existing unserviceable one complete all as specified and as directed size - 80 mm bore.. |
| 10 | Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:-15mm bore. |
| 11 | Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:-20mm bore. |
| 12 | Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:- 25mm bore. |
| 13 | Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:-50mm bore. |
| 14 | Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:-80mm bore. Please Enable Macros to View BoQ information |
| 15 | Taking up or down steel tubing/HDPE pipes alongwith fittings such as tee, bends etc and connections incl removal from site of the following sizes:-80mm bore. Please Enable Macros to View BoQ information |