| 1 | Restoration of rain cuts with soil , moorum gravel or a mixture of these, clearing the loose soil, benching for 300 mm width laying fresh material in layers not exeeding 250 mm and compaction with plate compactor or power rammer to restore the original alignment, level and slopes as per drawings and MoRD technical specification Clause 1902. By Mechanical Means |
| 2 | Removal of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment / subgrade, replacement by suitable soil, which shall be paid separately as per MoRD Technical Specification Clause 303.5.2 and as per MoRD Technical Specification Clause 302.3.11. |
| 3 | Cutting of trees, including cutting of trunks , branches and removal of stumps & roots, refilling, compaction of backfilling and stacking of serviceable material by manual means with all lifts as per MoRD Technical Specification Clause 201. A. Lead upto 100 m. . IV. Girth above 1800 mm to 2700 mm |
| 4 | Providing and placing gunny/ polythene (of minimum wall thickness of 500 micron) bags filled with sand (of minmum qty of 0.034 cum) and properly manually stitched to avoid any leakage of sand as per specification. |
| 5 | Single bamboo palasiding/ walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5. A) Driven at least 900 mm below ground and 1200 mm above ground on average |
| 6 | Flat Brick solingProviding and laying flat brick brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 7 | Providing and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 8 | Collection & supplying of 2nd class brick bats in/c carrying loading, unloading and stacking properly and laying the same in road depressions and stretches in/c spreading of blinding materials and to make it good to proper grade and camber in/c consolidation with wooden or steel rammer as per direction and satisfaction of the engineer -in- charge. |
| 9 | Patch repairing/Maintenance of bituminous surface road using Jhama brick aggregate & Viscosity Graded bitumen (VG-30)Repairing pot holes and making up small depressions with ramming or power rolling after removal / disposal of disintegrated materials within a lead of 50 m, cutting pot holes to regular shapes with vertical edges and levelling the bottom, cleaning the same with compressed air or any appropriate method including screening, cleaning of aggregates; annd filling up with jhama chips using bitumen of VG-30 @ 54 Kg per cum of loose volume of jhama brick chips, after applying tack coat of bitumen on sides and bottom @ 0.75 kg/sqm and finishing the top of required surface levelled with adjoining area in proper grade and camber including spreading of sand @ 0.006 cum/sqm of prepared road surface as per direction of the Engineer-in-charge and all as per MoRD technical specification Clauses 1900,502,503,504. |
| 10 | Manufacturing & supplying of machine made PVC wire crates chain link type made by S.W.G PVC wire bearing 12/10 SW. GI wire inside the PVC wire, size of cage 1500 mm. X 600 mm. X 450 mm. having square mesh of 80mm. X 80mm. including carrying to the work site as per direction of the Engineer-in charge (Weight of each cage shall not be less than 7.80 kg) |
| 11 | Supplying and stacking mixed class brick bats (50% first class & 50% un-class) including carriage loading & unloading at the site of work complete as per direction of the Engineer-in-charge |
| 12 | Labour charge for filling/packing of mixed class brick bats in S.W.G PVC wire crates of size of 1500 mm. X 600 mm. X 450 mm. fastening with SWG GI wire and placing in river bed/slope properly as per direction of the Engg-in-Charge. |
| 13 | Surface Drains Construction of unlined surface drains of average cross-sectional area 0.4 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307. i) Surface Drains in Ordinary Soil (A) Manual Means |
| 14 | Hill Side Drain Clearance Removal of earth from the choked hill side drain and disposing it on the valley side manually as per MoRT&H technical specification Clause 3000. Please Enable Macros to View BoQ information |