| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. |
| 2 | Providing and fixing G.I. pipes complete with G.I. fittings including trenching and refilling etc. External work, 25 mm dia nominal bore. |
| 3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes |
| 4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes |
| 5 | Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25 mm nominal bore. |
| 6 | Providing CPVC ball valve of approved make as per direction of EIC. 25 mm dia |
| 7 | Providing CPVC ball valve of approved make as per direction of EIC. 20 mm dia |
| 8 | Earthwork in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30cm ind epth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil. |
| 9 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1Cement : 4coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40mm nominal size derived from natural sources). . |
| 11 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) . |
| 12 | Providing and fixing up to floor five level precast cement concrete ring 6 ft dia including hoisting and setting, as per the direction of EIC. |
| 13 | Providing and fixing up to floor five level precast cement concrete ring 7 ft dia including hoisting and setting, as per the direction of EIC. |
| 14 | 12 mm cement plaster of mix: 1:6(1 cement: 6 fine sand). |
| 15 | Neat cement punning. |
| 16 | Brick work with Fly Ash Brick (230x115x75 mm size) bricks of class designation 10 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand). |
| 17 | Providing and fixing up to floor five level precast cement concrete string or lacing courses, copings, bed plates, anchor blocks, plain window sills, shelves, louvers, steps, stair cases, etc., including hoistingand setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), cost of required Centering complete. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). |
| 18 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 19 | Providing and fixing 1 HP pumpset and accessories , as per the direction of EIC. |
| 20 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |