|
| 1 | A):-Annual Maintenance of Air Conditioners along with Voltage stabilizer's installed at Various locations of GM Unit Kuju Area for a period of 02 years |
| 2 | Comprehensive Annual maintenance contract for 1.5/2 Tone Split and Window type Air Conditioners along with Voltage Stabilizer (work including replacement of compressor, repairing of stabilizer, fan motor, condenser motor, Gas charging, control card(PCB) display unit, condenser coil, evaporator coil, capacitor, thermostat, copper pipe, drain pipe etc.) |
| 3 | B):-Annual maintenance contract and servicing of split and window type Air condition along with voltage stabillizer for a period of 02 years at various location of karma OCP under kuju Area. |
| 4 | Comprehensive AMC for 1.5/2 Tn Split and Wiindow Air conditioners along with Voltage stabilizer for a period of two years (work including replacement of 1 compressor, repairing of stabilizer, fan motor, condenser motor, Gas charging, PCB, condenser coil, evaporator coil, capacitor, thermostat, copper pipe, drain pipe etc.) |
| 5 | Servicing and wet cleaning of Air conditioners Quaterly for a period of Two Years |
| 6 | C):-Repairing and servicing of 16 nos Air condtioner with voltage stabilizer as and when required at various location of Topa OCP |
| 7 | Replacement of Compressor 1.5Ton |
| 8 | Gas Charging |
| 9 | Replacement of PCB Card (Non-Inverter type AC) |
| 10 | Replacement of Indoor PCB (Inverter type) |
| 11 | Replacement of Outdoor PCB (Inverter type) |
| 12 | Indoor Motor Repairing (DC Inverter type) |
| 13 | Repairing of Transformer for Outdoor PCB (Inverter Type) |
| 14 | Repalcement of Running Capacitor (36MFD) |
| 15 | Repalacement of Filter & Capilary |
| 16 | Repacement of Starting Capacitor (80-100MFD) |
| 17 | Replacement of Blower Motor (Non-Inverter Type) |
| 18 | Replacent of Indoor Motor (Non-Inverter Type) |
| 19 | Replacement of outdoor condenser |
| 20 | Rewinding of Stablizer |
| 21 | Relay Change for Stablizer |
| 22 | PCB Kit for Stablizer |
| 23 | Servicing with labour Charge |
| 24 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |