| 1 | Erection of metallic pole above 10 mt. and up to 12 mtr. in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling, etc. as required. |
| 2 | Supplying and erection of galvanised stay set for 11 KV over head lines complete with 19/20 mm dia X 1.8 metres long stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm thick,thimble, stay clamps, turn buckle ( 20 mm X 600 mm ), 7/ 4.00 mm dia G.I. stay wire and 11 KV strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required. |
| 3 | Supplying of two lengths of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) double pole cross arm for three wire 11KV over head line conductors complete with through bolts and nuts for clamping to the poles, 50 mm X 6 mm M.S. flats welded on one side to the channel iron and with bolts and nuts on the other side for tying the cross arms together, including drilling holes for insulator pins/ fittings, bolts, nuts and washers etc (as per drawing) and painting with primer and finish paint as required. |
| 4 | Erection of double pole 3 wire cross arm for 11KV/ 22KV/ 33 KV over head lines as required. |
| 5 | Supplying and erection of 11 KV pin insulator complete with largesteel head G.I. pin, nuts, washers etc. as required. |
| 6 | Supplying and erection of 11 KV disc insulator for 11 KV over head lines with galvanised insulator fittings, ball and socket type and complete with galvanised strain clamps, bolts, nuts, washers etc. as required. |
| 7 | Erection of all aluminium conductor of 7/1.96 mm to 7/3.10 mm diametr and above including binding etc. as required. |
| 8 | Supplying of two lengths of channel iron 75 mm X 40 mm X 6 mm (7.14 kg per metre) double pole cross arm for three wire 11KV over head line conductors complete with through bolts and nuts for clamping to the poles, 50 mm X 6 mm M.S. flats welded on one side to the channel iron and with bolts and nuts on the other side for tying the cross arms together, including drilling holes for insulator pins/ fittings, bolts, nuts and washers etc (as per drawing) and painting with primer and finish paint as required. |
| 9 | Supplying and making outdoor cable end termination with heat shrinkable jointing kit complete with all accessories including lugs suitable for 120 Sqmm 3 core, XLPE aluminium conductor cable of 11 KV grade as required: |
| 10 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 11 KV grade Upto 120 Sqmm size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc as required. |
| 11 | Supply of 1C X 70Sqmm pvc Insulatted LT Allunimium Conductor . |
| 12 | Supplying and erection of stay set complete (galvanised) with 19/20 mm dia X 1.8 metreslong stay rod, anchor plate of size 45 cm X 45 cm X 7.5 mm, thimble, stay clamps, bow tightener, 7/ 3.15 mm dia G.I. stay wire and strain insulator etc in cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size ) foundation including excavation and refilling etc. as required. |
| 13 | Supplying of chhanel iron 75 mm X 40 mm X 6 mm (7.14 kg per meter) cross arm for 4 wire over head line complete with clamps, bolts, nuts, and washer etc including drilling of holes for insulator pins etc and painting with primer and finished paint as required. |
| 14 | Erection of angle iron/ chhanel iron cross arm on wood/RCC/PCC/steel tubular/rail pole etc. as required. |
| 15 | Suppling and erection of 100 mm X 110 mm shackle insulator with G.I. Bolt, nuts and straps etc. as required. |
| 16 | Supplying and erection of 100 mm X 80 mm pin insulator complete with G.I. Spindle and nuts etc. as required. |
| 17 | Erection of all aluminium conductor of 7/1.96 mm to 7/3.10 mm diametr and above including binding etc. as required. |
| 18 | Supply and Fixing Smc/Frp Bus Bar Box, Rectangular service connection box Dimensions- 300x200x125MM Suitable For All Sizes of Cable Pole Mounted Type Waterpfoor Weatherpfoor and Temparpoof. |
| 19 | Transportation of Over head line material like pole, conductor etc. to the work site as per the direction of E.I.C. |
| 20 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |