| 1 | Removing of old stone work of padmam, jagathi kumuthagam, kabothagam. |
| 2 | Removing of old stone work of Thai thun piller, bothiyal, uthiram. |
| 3 | Refixing of old stone work of padmam, jagathi kumuthagam, kabothagam. |
| 4 | Refixing of old stone work of Thai thun piller, bothiyal, uthiram. |
| 5 | Supplying of cut stone for carring out Garpagraham, Arthmandapam, Mahamandapam, Thirumathi; and other temple structures upto 5' feet . |
| 6 | Supplying of cut stone for carring out Garpagraham, Arthmandapam, Mahamandapam, Thirumathi; and other temple structures above 5' upto 10' . |
| 7 | Supplying of cut stone for carring out Garpagraham, Arthmandapam, Mahamandapam, Thirumathi; and other temple structures above 10' upto 14' . |
| 8 | Laying cut stone flooring using new stone 0.60 x 0.60 ( Cut stone flooring). |
| 9 | Labour charges for cut stone palamunai dressing excluding cost and conveyance of stone from quarry but including all labour charges for tools and plants for dressing charcoal scaffolding charges handling charges hoisting and fixing in position etc complete., |
| 10 | Pavukkal |
| 11 | Mugamandapam steps |
| 12 | Mugamandapam surul padi |
| 13 | Kalasam stone bed |
| 14 | Earth work excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. |
| 15 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 16 | Weathering course concrete with broken jelly 20mm size and pure slaked lime over RCC roof slab, the proportion being 32:12.5 for required depth of 80mm for giving required slope and thickness of roof on required, well beaten with wooden beater etc, complete with standard specifications. |
| 17 | Brick masonry Lime Mortar 1:2 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete,all pancharams, agarais, karnakoodus etc. |
| 18 | Brick masonry Lime Mortar 1:2 using Stock bricks including all varivargams, moulds, sthambams, mukapathrams, koodu, nasi and all ornamental brick work complete,all pancharams, agarais, karnakoodus etc. (Vimanam / Gopuram upto 25') |
| 19 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortar1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Combination Mortar1:1.4. |
| 20 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortar1:1.5 complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Combination Mortar1:1.4. |
| 21 | Painting two coat with approved ready mixed water based Emulsion paint with one coat of primer over the cement plastered wall surface, ceiling and other new surface including clearing preparing the surface curing in all floors including brushes etc., complete. |
| 22 | Scaffolding charges for Vimanans and gopurams with casurina posts coconut or plam trees wherever necessary for main, form work and providing with Non Flamable Shaded coverings, providing ladder arrangements, country wood plant for working, inspection etc, complete hire charges only for erection, maintenance and removing the same on completion of the work1 sq,ft. Gopuram Up to 25' ht. |
| 23 | Labour wrought and put up in position of frame below 1m for madras terrace roof |
| 24 | Sub Total |
| 25 | GST @ 18% Please Enable Macros to View BoQ information |