| 1 | Earth work in ordinary soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth and as per the direction of the Engineer-in-charge. |
| 2 | Clearance of slush and muck from foundation pit by manual means including removal of debris within 50 m initial lead and lift of 1.50 m as directed by the Engineer-in-charge. |
| 3 | Excavation of foundation in all kinds soil within 50m Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth etc. complete as per direction of the Engineer in charge. |
| 4 | Collecting, Conveying and Spreading admixture of sand and moorum in 40 : 60 proportion for CNS layer of approved quality well compacted on finished slope and bed of canal with watering including cost, conveyance, royalty, taxes and labour charges etc. complete and as per the direction of the Engineer in Charge. |
| 5 | Providing form work for concrete with F1 finish for upstream faces of dam, spillway, glacis of barrages, unexposed surfaces of foundation, block joints etc. with steel shutters rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour, materials and T&P complete and as per the direction of the Engineer-in-charge. |
| 6 | Cement concrete M15 grade with 20mm and down graded hard granite crusher broken chips with well graded screened and washed sand free from silt and girth including mixing by concrete mixture, placing manually, compacting with vibrator, including cost, conveyance, royalty, taxes and labour charges etc complete and as per the direction of the Engineer-in-charge. |
| 7 | Providing and laying cement concrete M15 grade with 20mm and down graded hard granite crusher broken chips for concrete lining to the bed and slope of canal with sleeper beams, keys etc in panels including mixing by concrete mixture, placing manually, compacting with vibrator, including cost, conveyance, royalty, taxes and labour charges etc. complete and as per the direction of the Engineer-in-charge. |
| 8 | Laying and fixing in position of 100mm diameter NP2 R.C.C. Spun pipes with collar jointed with cement mortar (1:3) including cost, conveyance, taxes and labour charges etc. complete and as per the direction of the Engineer-in-charge. |
| 9 | Laying and fixing in position of 150mm diameter NP2 R.C.C. Spun pipes with collar jointed with cement mortar (1:3) including cost, conveyance, taxes and labour charges etc. complete and as per the direction of the Engineer-in-charge. |
| 10 | Laying and fixing in position of 900mm diameter NP3 R.C.C. Spun pipes with collar jointed with cement mortar (1:3) including cost, conveyance, taxes and labour charges etc. complete and as per the direction of the Engineer-in-charge. |
| 11 | Clearing grass and removal of rubbish up to a distance of 50m outside the periphery of the area etc complete and as per the direction of the Engineer-in-charge. |
| 12 | Filling in foundation and plinth with excavated earth including watering and ramming etc. complete and as per the direction of the Engineer-in-charge. |
| 13 | Dismantling Stone masonry in cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m lead etc. complete and as per the direction of the Engineer-in-charge. |
| 14 | Dismantling and removing Cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead etc complete and as per the direction of the Engineer-in-charge. |
| 15 | Dismantling and removing R.C.C. Columns beams slab staircase landing lintels including stacking the useful materials for reuse and removing the debris within 50m lead etc complete and as per the direction of the Engineer-in-charge. |
| 16 | Rough stone dry packing and revetments with 15cm to 30cm size other than granite stones including filling the interstices with small stones including cost, conveyance, royalty, taxes of all materials and labour charges but excluding cost of stone etc. complete and as per the direction of the Engineer-in-charge. |
| 17 | Supplying, fitting and placing uncoated HYSD bar reinforcement including cost, conveyance, taxes of all materials and labour charges etc complete and as per the direction of the Engineer-in-charge. |
| 18 | Reinforced cement concrete M20 grade with 20mm and down graded hard granite crusher broken chips with well graded screened and washed sand free from silt and girth including mixing by concrete mixture, placing manually, compacting with vibrator, including cost, conveyance, royalty, taxes and labour charges etc complete and as per the direction of the Engineer-in-charge. |
| 19 | Excavation of any approved type of soil in approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within intial lead of 5 km on properly prepared and scientifically approved surface including spreading and levelling the earth in 22.50cm layers to make ready for watering and compaction with sheep foot rollers and dozers but excluding watering and compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area etc complete and as per the direction of the Engineer-in-charge. Please Enable Macros to View BoQ information |