|
| 1 | Tree Cutting |
| 2 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Girth - 30-60 cm |
| 3 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Girth - 60-120 cm |
| 4 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Girth - 120-240 cm |
| 5 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Girth - above 240 cm |
| 6 | Creation of 60,000 Plantation of Trees Saplings |
| 7 | Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 15 cm measured at a height of 30 cm above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared (if required).Note: No native ground vegetation/natural regeneration shall be removed/disturbed from the plantation site. The jungle clearance may be kept minimum to protect the top soil from soil erosion.6,00,000 Sqm of Area (60 ha.) |
| 8 | Digging pits in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately)Dimension of Pits shall be 60 cm x 60 cm x 60 cm |
| 9 | Providing good quality saplings of native forestry trees species having minimum 6 feet height, for Ridge/Non-Ridge at plantation site. |
| 10 | Supplying, stacking and providing of well-decayed cattle manure to all tree saplings at various plantation sites during creation including royalty and carriage up to 5 k.m. lead complete (Cattle manure measured in stacks will be reduced by 8% for Payment). |
| 11 | Supply and spreading of good quality Neem Cake manure free from any impurities for all tree saplings @100 grams per plant. |
| 12 | Supply and spreading of good quality Vermi Compost manure free from any impurities for all Tree Saplings @ 200 grams per plant. |
| 13 | Planting of Tree saplings at the Pits (60 cm x 60 cm x 60 cm) at various plantation sites including watering and removal of un-serviceable materials as per direction of officer in charge (excluding cost of plant & water). |
| 14 | Providing and watering of plants with Sewage Treated water through water tanker of Horticulture features at the site of work.Water tanker having 5000-liter capacity with one labor for watering including cost of water, filling of tanker, watering the plants at various plantation sites with all leads and lifts as per direction of officer-in-charge.Watering to be done while undertaking plantation with 25 L of water per plant in well prepared water basin around each plant (including cost of water tanker and manpower) (2 times). The cost of water has been added for a distance leads upto 20 KM. |
| 15 | Supply of Good quality Bamboo Sticks of minimum 6 feet in height (per sapling) for providing support to the Tree Saplings. |
| 16 | First Year Maintenance of Plantation of 60,000 numbers of Tree Saplings |
| 17 | Complete maintenance of plantations including cultural operations (Weeding, Soil working, Mulching and canopy opening), watch and ward (Protection), irrigation, pest and disease management etc, for the period of one year after creation. |
| 18 | Supplying, stacking and providing of well-decayed cattle manure to all tree saplings at various plantation sites including royalty and carriage up to 5 k.m. lead complete (Cattle manure measured in stacks will be reduced by 8% for Payment) as per the instruction of In-Charge Officer. |
| 19 | Supply and spreading of good quality Neem Cake manure free from any impurities for all tree saplings @100 grams per plant as per the instruction of In-Charge Officer. |
| 20 | Supply and spreading of good quality Vermi Compost manure free from any impurities for all Tree Saplings @ 200 grams per plant. |
| 21 | Providing and watering of plants with Sewage Treated water through water tanker of Horticulture features at the site of work.Water tanker having 5000-liter capacity with one labor for watering i/c cost of water, filling of tanker, watering at the site with all leads and lifts as per direction of officer-in- charge.As per watering schedule for first year maintenance, watering to be done to each plant in well prepared water basin with 25 L of water per plant (including cost of water tanker and manpower) (47 times). |
| 22 | Creation of Plantation of 90,000 Nos. of Shrubs/Climbers/Bamboos |
| 23 | Digging pits in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately).Dimension of pits shall be 45 cm x 45 cm x 45 cm |
| 24 | Providing good quality native species of shrubs and Climbers having minimum height of 2 feet, shifted in a 30 cm polybag as per direction of officer in-charge. The saplings should be healthy and well- developed. |
| 25 | Supplying and stacking of well-decayed cattle manure at site including royalty and carriage up to 5 k.m. lead complete (Cattle manure measured in stacks will be reduced by 8%for Payment). |
| 26 | Supply and spreading of good quality Neem Cake manure free from any impurities to all the shrubs and bamboos @ 100 gm per plant. |
| 27 | Supply and spreading of good quality Vermi Compost manure free from impurities to all the shrubs and bamboos @ 200 grams per plant. |
| 28 | Plantation of native Shrubs and Bamboos in Pits (45 cm x 45 cm x 45 cm) at various plantation sites i/c watering and removal of unserviceable materials as per direction of officer in charge (excluding cost of plant & water) |
| 29 | Providing and watering of all shrubs and bamboos with Sewage Treated water through water tanker of Horticulture features at the site of work.Water tanker having 5000-liter capacity with one labor for watering i/e cost of water, filling of tanker, watering at the site with all leads and lifts as per direction of officer-in- charge.Watering shall be done while undertaking plantation with 10 L of water per plant in well prepared water basin around each plant (including cost of water tanker and manpower) (2 times). The cost of water has been added for a distance leads upto 20 KM. |
| 30 | First Year Maintenance Work for Plantation of 90,000 Nos. of Shrubs/Climbers/Bamboos |
| 31 | Supplying, stacking and spreading of well-decayed cattle manure to all shrubs and bamboo at various plantation sites including royalty and carriage up to 5 k.m. lead complete (Cattle manure measured in stacks will be reduced by 8% for Payment) |
| 32 | Supply and spreading of good quality Neem Cake manure free from any impurities to all shrubs and bamboos @ 100 grams per plant. |
| 33 | Supply and spreading of good quality Vermi Compost manure free from any impurities to all shrubs and bamboos @ 100 grams per plant. |
| 34 | Providing and watering of shrubs and bamboos with Sewage Treated water through water tanker of Horticulture features at the site of work.Water tanker having 5000-liter capacity with one labor for watering i/e cost of water, filling of tanker, watering at the site with all leads and lifts as per direction of officer-in- charge. After plantation, watering around each plant with 10 L of water two times (including cost of water tanker and manpower). The cost of water has been added for a distance leads upto 20 KM. |
| 35 | Fencing of Plantation Site |
| 36 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(Using ISA 50X50 having 5 mm thickness)Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.(Using MSF 15 mm Wide and 4 mm thickness)Dash hold fastener 12.5 mm dia, 50 mm long with 6 mm dia boltProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)Steel TATA Wiron Galvanized Chain Link Fencing having mesh Size of 50.8x50.8 mm and dia of wire 10 Gauge (2.5 mm).One Roll Length-50 ft. (15.24 m)Height - 6 ft. (1.83 m)Features:Withstands corrosion/rusting better ensuring longevity.Uniform mesh size and wire thickness throughout.Installation of Chain link Fencing throughout perimeter of Site. Please Enable Macros to View BoQ information |