| 1 | Civil Works |
| 2 | P-268, It- 19,Building work -Vol(i)Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof(a) upto 150 mm. thick |
| 3 | P-11, It- 10,,Building work -Vol(i) Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. |
| 4 | P - 12, It - 13,Building work -Vol(i)Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. |
| 5 | P-2, It- 4(A),Building work -Vol(i)A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 6 | P- 24, It. 4a, ,Building work -Vol(i)Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground flooras per relevant IS codes. |
| 7 | P - 189/ It-1(i-b,c & ii-c), Add : P - 193/it-23(i & ii),Building work -Vol(i)Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (b) 20mm thick plaster (1:6 cement sand morter) external plaster |
| 8 | (c) 15mm thick plaster (1:6 cement sand morter) internal wall plaster |
| 9 | P - 74 It-47,Building work -Vol(i) Supplying& laying 20 mm designer chequered tiles of any shade and of approved quality as per IS: 1237: 1980 laid in patterns as directed in pavement, footpath including necessary underlay 25 mm thick average cement mortar (1:3) complete in all respect with all labour and materials [using cement slurry @ 4.4 kg/Sq.m at back side of tiles. Cement of mortar & slurry will be supplied by the Department. Border concrete if necessary to be paid separately]. |
| 10 | P - 105, It - 16-SOR-2017,Building work -Vol(i)M.S. gate of Jail type as per approved design made of strong M.S. frame work, intermediate stiffeners and round / square bars or angles. M.S. sheet (not less than 14 gauge) gussets, cleats etc. including necessary riveting, bolting, welding, locking and hanging arrangements, fitting and fixing complete as per direction of the Engineer-in -charge.In ground floor. |
| 11 | P-104 It-12 M.S. works in framed gratings of window etc.made of round or square bars and frame work or M.S. flats (with the bars securely fixed to the flat bar frame) with or without intermediate flat bar stiffener and fixed with necessary screws etc. complete, as directed. In ground floor |
| 12 | P-99, I-1,Building work -Vol(i)M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-in- charge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperatepayment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. |
| 13 | P-101, It-2A-(i-a)M.S. structural works with hollow sections (square or rectangular shape) conforming to IS: 806-1968 & IS:1161-1998) connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1969 & IS: 9595 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour reqired for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finishedstructural members. The rates are considered for a hight of erection 8 m. / 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof. a) Span up to 12 Mtr |
| 14 | P-222, I-11,Building work -Vol(i)Supplying, fitting, fixing, Chain link fencing of approved quality with R.C.C posts wooden posts or iron posts by means of galvanised \\"C\\" clips to grid of horizontal strands of galvanised high tensile spring steel wire of 12 S.W.G which have to be tensioned and fixed to the vertical posts by means of galvanised special clips, bolts and nuts etc. (VI) 25 mm. x 25 mm. x 12 g. |
| 15 | P-196 /I-7(b) (i):,Building work -Vol(i) Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor) |
| 16 | P-196 /I-8(b) (i): ,Building work -Vol(i) Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. In Ground Floor: (a) One Coat |
| 17 | P-201/It-4,Building work -Vol(i)Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) :(Two coats)ii) Luxury Quality |
| 18 | P-197/It-17,Building work -Vol(i)Protective and Decorative Acrylic exterior emulsion paint of approvedquality, as per manufacturer's specification and as per direction of Engineer-in-Charge to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer.c) Super Protective 100% Acrylic Emulsion |
| 19 | P-200/I-1(a): ,Building work -Vol(i) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 20 | P-200/I-2 (A-b-iv),Building work -Vol(i)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (b) On steel or other metal surface : With other than hi-gloss of approved quality- (iv) Two coats (with any shade except white) |
| 21 | P-81 It-9(i)(a),Building work -Vol(i) Galvanised corrugated iron sheet work (excluding the supporting frame work) fitted and fixed with 10 mm. dia J or L hook-bolts, limpet and bitumen washers and putty complete with 150 mm. end lap and one corrugation minimum side lap. (Payment to be made on area of finished work)(GCI sheet tobe supplied by contractor) (i) In Roof:- a) With 0.60 mm thick sheet |
| 22 | P-249, It-23Labour charge for fabrication and installation of structural Glazing/Curtain Wall made from annodized extruded allooy aluminium sections for the following units: Structural Glazing made of extruded and annodized alloy aluminium sections, fabrications including cutting to proper shape and size, drilling including cost of brackets, fastener bolt, mullion bolt, nuts & washers, maskin tape, double side adhesieve crosslink foam (used for guard of glazed silicon on sub-frame), tissue paper foam (used as filler between sub-frame and under backing of weather silicon), screws and other necessary hardwares, fixing of glass as per drawing, specification and direction of Engineer-in-Charge. (The rate includes hire charges of all tools and plants, including all incidental charges, adhesieve, joiners such as screw,cleate angle,etc. but excluded the cost of extruded aluminium sections, glass, glazed silicon, weather silicon etc.) |
| 23 | P-248, It-21Supplying Weather Silicone sealant of approved make and brand for fixing of grove line between the Glasses as per direction of Engineer-incharge. for Structural Glazing/Curtain wall.Weather Silicone sealant for filling the Grove line between Glasses or any other material for facial work |
| 24 | NON-SCHEDULE ITEM :fitting & fixing of old chainlink net with galvanised \\"c\\" clips or G.I wire with iron post |
| 25 | Add 18% GST on Total Cost of Civil Works |
| 26 | Add 1% Labour Welfare Cess Please Enable Macros to View BoQ information |