|
| 1 | Less Credit of Old Bricks |
| 2 | Less Credit of Old Bricks*** |
| 3 | Less Credit of old Brick Bats |
| 4 | Less Credit of old Panel Board at existing water works |
| 5 | Supplying, erection, testing and commissioning of Horizontal motor pumping set for Raw water having head 12 m as per the indicated requirements of discharge in LPM and power capacity in BHP Make: KSB, CRI, Kirlosker, Crompton Greeve, Lubi) for Raw Water 1800LPM x 12 mtr head |
| 6 | Less Credit of old Pumping Machinery for Clear Water at existing water works 2 Nos. 30.00 BHP X 45.00 Mtr head 1600 LPM |
| 7 | Less Credit of old Pumping Machinery for Raw water at existing water works 2 Nos. 7.5 BHP X 12.00 Mtr head 1600 LPM |
| 8 | Water Treatment Plant (WTP) - Designing, Testing, Construction and Commissioning of 1.00 MLD capacity water treatment plant including inlet channel alum dozing, flash mixing, clari floculator, filtter box, over head reservoir for back wash, waste water tank, including all civil work pumping machinery and electric cabling, control panel, entire piping network of suitable size, supplying, laying, cutting and jointing of DI pipes from raw water pump to inlet box of WTP, WTP to CWT and Suction well for CW including, DI specials suitable size sluice valves, hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed with automation complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG)on complete in all respects as per approved NIT. (Sluice valve of make IVCAWAG) |
| 9 | i) Operation and maintenance during defect liability period after 3 months Trial Run Period |
| 10 | ii) Operation and maintenance during 1st Year after defect liability period |
| 11 | iii) Operation and maintenance during 2nd Year |
| 12 | iv) Operation and maintenance during 3rd Year |
| 13 | v) Operation and maintenance during 4th Year |
| 14 | vi) Operation and maintenance during 5th Year |
| 15 | Item Description |
| 16 | HSR Items for DNIT Name : Bahbalpur Estimate for improvement water supply scheme in village Bahbalpur Distt. Hisar [PUH/2025- 26/104314] “ Const. of 2 Nos. RCC S and S tank, Const. of WTP 1.00 MLD Capacity, Const. of CWT, Const. of B/Wall, Raising of Pump chamber and pipe line at Head works, Const. of I/Channel inside w/w, Replacement of Pumping machinery at w/w, laying, jointing, cutting , commissioning and testing of 100 mm i/d 13720 mtr. 150 mm i/d DI pipe 2265 mtr., and 200 mm i/d 170 mtr. DI pipe in village Bahbalpur including Operation and Maintenance of WTP during defect liability period of 12 months after successful completion of 3 Months trial run and thereafter for 5 years complete in all respect and all other works contingent thereto.” Please Enable Macros to View BoQ information |