| 1 | Diverson of water during work in progress as per direction of E/I |
| 2 | Dismantling of Old dammaged brick work as per SI no. 692 |
| 3 | E/w excavation in foundaton in ordinary soil etc. as per S.I. No-251 Total Excavation Less Qty of old damaged Wrick work in Item No 2 |
| 4 | Disposal of excaved material from site upto 5 km Total Excavation in Item No 3 Qty of old damaged Wrick work in Item No 2 |
| 5 | Providing and Laying of Cement Concrete in 1:3:6 (1 Cement : 3 Coarse Sand : 6 graded stone ballast 40 mm nominal size) including supply of all matterial, Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors. As per SOR Chp-5 Item S.I.No 280 |
| 6 | First class Brick work in 1:4 in Cement and Coarse Sand Mortor in foundation and plinth including supply of all matterials, labour and T&P etc.required for proper completion of the work as per SOR 2022 Chp-6 S.I.No- 305(b) For Drain Base Both Side Wall |
| 7 | Deduction of old used material (i)-Dedcution of fresh brick |
| 8 | Deduction of old used material (ii)-Dedcution of brick ballast |
| 9 | 2.50cm. (1\\") thick damp proof coarse with cement concrete consisting of one part cement 1.5 parts approved coarse sand and 3 parts approved 13 mm. (1.5\\") graded stone grit and including water proofing materials as ordered by the Engineer-in-charge in the proportion as specified by the manufacturers. As per SOR-2022 Chp-7 Item No. 361 |
| 10 | 12 mm thick plaster with cement mortar in proportion of 1:2 cement and fine sand of 1.25 F.M. As per SOR 2022 Chp-13 Item No. 580 |
| 11 | Reinforced cement concrete work with cement approved coarse sand and 2 cm gauge approved stone ballast in the proportion of 1:1.5:3 in Drain for Base & Cover Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G. GI binding Wire and including necessary centering and shuttering etc. and also including supply of all matterials, labours and T&P etc. required for proper completion the work. Binding wire cost being included in the item. For Drain Cover |
| 12 | Mild steel or Iron work in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shapes asnecessary including bending for proper completion of thework and including supply of all steel and wastages and over laping and hooks. 1.00% of concrete Qty in item no 10 |
| 13 | C C Road Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. over BOE |
| 14 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per clause 1501.22 M30 (Grade), coarse and fine aggregates conforming to IS: 383, miximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days. Providing & Fixing of Inagration Board |
| 15 | Providing & Fixing of Ingration Board Please Enable Macros to View BoQ information |