|
| 1 | M & R to Roads in Satara, Addnl Satara and Koregaon Industrial Area...Pre & Post monsoon work... Cleaning of road side gutter, CD work, providing rain cuts in Satara, Addnl Satara and Koregaon Industrial Area… |
| 2 | Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location etc. complete |
| 3 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . |
| 4 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 5 | Procuring JCB at site of work and cleaning of existing gutters in indl.area and residential area or as directed by Engineer-in-charge. |
| 6 | Hiring of Dumper / tipper having 6 Cum capacity for disposal of debris, garbage, bushes etc. at suitablelocation identified by engineer-in-charge for 8 hrs. working day. |
| 7 | Cleaning of CD works, slabs drains in Satara and Addl Industrial area by engaging manpower & machinery asper instruction of Engineer - incharge. |
| 8 | Supply of unskilled labour for misc. work in the area during premonsoon & monsoon period or directed byEngineer-in-charge |
| 9 | Providing bituminous speed breakers at junctions and intersections. |
| 10 | No of speed breaker on 7.50 m width road |
| 11 | No of speed breaker on 5.50 m width road |
| 12 | Providing and Laying hot applied thermoplastic road marking strip on Bituminous Surface of specifiedshade/ colour of 2.5 mm thick including 1.5 Refractive index reflectorizing glass beads @ 250gm/sqm .Thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC 35:2015. Initial Dry reflectivity RL shall be > 250 mcd/sqm/lux measured in the initial7 days and sustained reflectivity RL of 100 mcd/sqm/ lux and Qd of 100 mcd/sqm/ lux measured at the end of2 years by means of a Standard Reflectometer of Zehntner, Easylux, Delta make capable of measuring RL & QD both according to IRC 35:2015 clause 15.5. The finished surface to be level, uniform, and free fromstreaks and holes complete as per direction of Engineer-in-charge and in accordance with applicablespecifications.(Refer MORTH Clause 803 for technical Specification and Performance for IRC 35:2015). |
| 13 | Providing and fixing Cautionary/Warning sign boards in Equilateral Triangle size of ____mm made out of ___mm aluminum sheet bonded with white retro reflective sheeting of Class B ( Type IV High intensity micro-prismatic grade sheeting-HIP) having pressuresensitive/heat activated adhesive retoreflective specified back ground, border and back side retoreflctive symbols, letters, numerals, arrow asper IRC:67-2012 Table No 8.3 Supported with back support frame 25mm x 25mm x 3mm, duly paintedon back side with grey stove enamel paint and supported on one no. of M. S. angle iron post of size 65 mm X 65 mm X 6 mm, 3.45 m long, duly painted with with flat oil paint having alternate black and whitebands of 25 cm width including G.I. fixtures etc; fixing the boards in M25 grade concrete block of size 60cm X 60cm X 75cm including transportation etc; complete. Class B ( Type IV High intensity micro-prismatic grade sheeting-HIP) shall have 7 yearswritten warranty from the manufacturer and authorised distributor/convertor issued for fieldperformance including the screen printed areas and cut-out sheeting and cut-out durable transparentoverlay film and this warranty certificate in original should be submitted to the Engineer in chargeby the contractor/supplier. |
| 14 | 600 mm made out of 1.5mm aluminum sheet |
| 15 | Cutting of branches of trees and shrubs from the road way or with in R.O.W including disposal of wood and leaves to suitable location etc. complete |
| 16 | Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . |
| 17 | Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. |
| 18 | Procuring JCB at site of work and cleaning of existing gutters in indl. area and residential area or asdirected by Engineer-in-charge. |
| 19 | Hiring of Dumper / tipper having 6 Cum capacity for disposal of debris, garbage, bushes etc. at suitable location identified by engineer-in-charge for 8 hrs. working day |
| 20 | Cleaning of CD works, slabs drains in Koregaon Industrial area by engaging manpower & machinery as per instruction of Engineer - in- charge. |
| 21 | Supply of unskilled labour for misc work in the area during premonsoon & monsoon period or directed byEngineer-in-charge Please Enable Macros to View BoQ information |