|
| 1 | Excavation including loading unloading disposal and dressing of excavated earth within initial lead of 50m. & lift up to 1.50m in dry or moist including dressing of excavated area de-watering wherever required complete in all respect. Hard/dense soil. |
| 2 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 3 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto;20 mm |
| 4 | Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(For mix design Cement content considered 420 kg/ cum of concrete) 20 mm |
| 5 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. (IS :1786-1985) |
| 6 | Side shuttering including propping etc. complete (to achieve finish F 2 for : |
| 7 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove |
| 8 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement.In foundation rafts, beams, columns bases stilling basins, buckets,aprons etc. (non suspended horizontally laid mass concrete) |
| 9 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement.Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls,piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. Please Enable Macros to View BoQ information |