| 1 | Earth work for Sewer line and Manhole in excavation in foundation, trenches, manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material / earth to complete the task. |
| 2 | In all types soils such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. |
| 3 | Depth upto 1.5 m |
| 4 | over all depth of excavation above 1.5 m and upto 3.0 m |
| 5 | over all depth of excavation above 3.0 m and upto 4.5 m |
| 6 | In Ordinary Rock |
| 7 | Depth upto 1.5 m |
| 8 | over all depth of excavation above 1.5 m and upto 3.0 m |
| 9 | over all depth of excavation above 3.0 m and upto 4.5 m |
| 10 | In Hard Rock |
| 11 | Depth upto 1.5 m |
| 12 | over all depth of excavation above 1.5 m and upto 3.0 m |
| 13 | over all depth of excavation above 3.0 m and upto 4.5 m |
| 14 | Add extra over item no 17.1.1, 17.1.2, 17.1.3 and 17.1.4 in RUIDP SOR for excavation in saturated soil, silt, rock and sludge where pumping or bailing out of water including well point if required for sewer line and manhole. |
| 15 | Excavation depth from ground level 0.0 to 9.0 m |
| 16 | Excavation from Encountered depth of Water table 0.0 to 1.5 m |
| 17 | Excavation from Encountered depth of Water table 1.5 to 3.0 m |
| 18 | Excavation from Encountered depth of Water table 3.0 to 4.5 m |
| 19 | Excavation from Encountered depth of Water table 4.5 to 6.0 m |
| 20 | Excavation from Encountered depth of Water table 6.0 to 7.5 m |
| 21 | Providing and fixing OPEN timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete for following depth below NGL. |
| 22 | Depth upto 3.0 m |
| 23 | Depth more than 3.0 m and upto 6.0 m |
| 24 | Depth beyond 6.0 m |
| 25 | Extra for planking, strutting and packing material for cavities IN OPEN TIMBERING of sewer line and manholes if required to be left permanently in position (face area of timber permanently left to be measured) |
| 26 | Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths full round HDPE DWC (double wall corrugated) pipes of SN8 grade as per IS16098 (Part 2) amended upto date in trenches in complete including all material, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications, drawings and as per direction of Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. |
| 27 | 200 mm ID |
| 28 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sheive, 20 to 50 % passing through 10mm sheive and 100 % retain on 6.3mm sheive, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer. |
| 29 | 200 mm internal diameter |
| 30 | Providing and fixing Barricading at site of work for restricting the general public using 80-100 mm dia Wooden Ballies as vertical post with average spacing of 1.80 metre between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing two rows of 80-100 mm Wooden Ballies as horizontal members with jute russies. Both vertical and horizontal members shall be painted in red and white colour strips as per approved pattern as and when it becomes shabby but at least after every alternate shifting at new location. After shifting/ removal of barricading holes shall be filled up properly and site is to be cleared in all respect. (Note: measurement is to be done in linear basis) |
| 31 | Providing Barricading for Trenches using 80 - 100 mm dia Wooden Ballies as vertical post, atleast 1.5m above ground level and atleast 30-45 cm below ground level at a spacing of 3 m. Two rows of PVC Tape (preferabley red in colour) strip barricading horizontal strip securely tied by the vertical members. Vertical members shall be painted in red and white colour. Rate is inclusive removal and cleaning of site complete in all respect. |
| 32 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.0m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.0m, vertical height 0.805m, wall thickness 125mm), and circular ringsof required heights (ID 1.0m, height 150/225/300/600 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.625m dia and 150mm thickness, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplyingand fixing plastic encapsulated CI/MS foot steps / SFRC foot steps, including cost of shuttering, steel reinforcement, testing for water tightness etc. complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. |
| 33 | Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 0.805), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + 50mm) |
| 34 | Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.0m, wall thickness 125mm, height 150/225/300/600 mm for constructing extra depth of manhole beyond depth mentioned in item no-17.59.1 as per drawing. |
| 35 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.2m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.2m, vertical height 1.005m, wall thickness 125mm), and circular rings of required heights (ID 1.2m, height 150/225/300/600/900mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in Conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.825m dia and 150mm thickness, PCC M15 grade circular wall ID 1.125m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS footsteps / SFRC footsteps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. |
| 36 | Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.005), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.125m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm) |
| 37 | Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.2m, wall thickness 125mm, height 150/225/300/600/900mm for constructing extra depth of manhole beyond depth mentioned in item no-17.60.1 as per drawing. |
| 38 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.5m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.5m, vertical height 1.305m, wall thickness 125mm), and circular rings of required heights (ID 1.5m, height 150/225/300/600/900/1200 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 2.125m dia and 150mm thickness, PCC M15 grade circular wall ID 1.425 m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS footsteps / SFRC footsteps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. |
| 39 | Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.305), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.425m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm) |
| 40 | Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.5m, wall thickness 125mm, height 150/225/300/600/900/1200mm for constructing extra depth of manhole beyond depth mentioned in item no-17.61.1 as per drawing. |
| 41 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint , (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing and commissioning etc complete as directed by Engineer.Note : E/w to be measured and paid separately. |
| 42 | 110 mm Nominal Dia |
| 43 | 160 mm Nominal Dia |
| 44 | Providing PVC-U pipes as per IS 15328 drop connection externally for depth from 0.60 m and upto 1.0 m drop from branch sewer line to main sewer manhole or vise versa including inspection and cleaning eye, PVC-U drop pipe and bend encased around with cement concrete M15 with all form work, cutting holes in walls and making good with brick/ stone masonry work in cement sand mortar 1:4 plastered with cement sand mortar 1:3 with stiff cement mortar 1:1 around PVC-U pipe in masonry wall, making required channels complete as per standard design and specifications and/ or as the directed of the Engineer: |
| 45 | 110mm dia |
| 46 | 160mm dia |
| 47 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres, stacking serviceable and unserviceable materials separately as directed by Engineer including allowances for any additional dismantling beyond the drawings( measurement for payment to be as per standard drawings), re-handling of material / earth to complete the task. |
| 48 | Bituminous courses |
| 49 | Granular courses |
| 50 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:3:6 (1 Cement : 3 fine/ coarse sand : 6 graded stone aggregate 40 mm nominal size). |
| 51 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 52 | Construction of stone masonry cylindrical road side inspection chamber of 450mm dia (internal) with 300mm thick wall of stone masonry in cement mortar 1:4 (1 cement : 4 coarse sand), filling of Jhiri, 20mm thick inside and outside plastering with CM (1:3), inside plaster finished with neat coat of cement, with cast in situ PCC M10 grade foundation of 1150 mm dia and 100 mm thickness,, 75mm thick PCC M15 flooring, precast SFRC/RCC circular 450mm dia MD manhole frame and cover (as per IS 12592 amended upto date) embedded in 200mm thick PCC M20 grade concrete, including providing and fixing 2 Nos 110mm OD, 0.5m long PVC-U pipe pieces of stiffness class SN 8 as per IS 15328 and plugging the same, testing for water tightness etc. complete as per approved drawing and/or directed by Engineer. Note: Excavation of earth work and road cutting will be measured and paid separatelySM Road side inspection chamber of 900mm depth |
| 53 | Providing and making connection to the manhole/ road side chamber/ property chamber by cutting hole in wall, making good the same with brick work/ stone masonry work in cement mortar 1:4, plaster in cement mortar 1:3, encasement of pipe at manhole with 75mm thick M15 grade concrete etc complete as directed by Engineer. |
| 54 | Brick masonry with F.P.S. bricks of class designation 75 in foundation and plinth with bricks Cement mortar 1 : 4 (1 cement : 4 coarse sand) |
| 55 | Half brick masonry in foundation & plinth using bricks of designation 75 (1 cement : 4 coarse sand) |
| 56 | Providing, laying, spreading and compacting specified graded crushed stone in sub-base course including premixing the material at OMC in mechanical mixer (Pug mill), carriage of mixed material, laying in uniform layers with motor grader, F.E.loader on a prepared surface and compacting with vibratory compactor to achieve the desired density including all material, labour, machinery, lighting barricading and maintenance of diversioncomplete.[MoRTH specification Clause 401] with all lead Please Enable Macros to View BoQ information |