Tender For Supply And Application Of Protective Painting On Pre-Engineered Building (Peb) Structures At Elevated 7 Stations Of Phase-1 Of Mumbai Monorail., Mumbai-Maharashtra
TDR : 55433903
Tender Notice
BOQ
25 Days Left
Mumbai
Maharashtra
Tender For Supply And Application Of Protective Painting On Pre-Engineered Building (Peb) Structures At Elevated 7 Stations Of Phase-1 Of Mumbai Monorail.
Name of Work:- Supply and Application of Protective Painting on Pre-Engineered Building (PEB) Structures at Elevated 7 Stations of Phase-1 of Mumbai Monorail.
Sl. No.
Item Description
1
Item Rate BoQ BoQ_Ver4.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Managing Director Name of Work: Supply and Application of Protective Painting on Pre-Engineered Building (PEB) Structures at Elevated 7 Stations of Phase-1 of Mumbai Monorail. Tender Reference No.: Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Description Item Code / Make Qty Units Estimated unit Rate(Excl. GST) Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Per Unit Rate(Excluding GST)Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without GST(51=4*13) TOTAL AMOUNT with Taxes(53=51*1.18) TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
2
Supply and Application of Protective Painting on Pre-Engineered Building (PEB) Structures at Elevated 7 Stations of Phase-1 of Mumbai Monorail.
3
Surface Preparation: - Removal of existing paint, rust from steel structures using power tool cleaning, solvent cleaning, suitable technique (STD St2/St3) as approved by Engineer-in-charge to achieve Surface cleanliness to assure good bonding of new paint, including all safety measures, debris collection & disposal outside the Monorail premisesA. Supply & application of paint on steel members of Monorail structure• 1st Under-Coat: Surface tolerant epoxy mastic primer with 80% Volume Solid – DFT: 125 μm • 2nd Under-Coat: Epoxy Mastic/MIO barrier coating with 80% Volume Solid – DFT: 125 μm• 3rd Finish Coat: Acrylic polyurethane finish (aliphatic isocyanate cured), DFT: 60μm – Applied via spray or brush in approved color.• Total System DFT: 310 μm Performance warranty: Minimum 5 YearsNote:-1. Rates are inclusive of all manpower, machinery, scaffolding, shuttering, safety equipment, painting tools, power supply, fabrication and erection equipment, handling, loading/unloading, transport, and other T&P (Tools & Plants) required for execution.2. One qualified engineer must be deploy full-time at site during the entire duration of the work for coordination, safety supervision, and quality assurance.3. All work is to be carried out strictly during Power Block hours from 12:00 AM to 4:00 AM (Night Shift). No additional payment shall be made for night shift operations.4. In case of any planned work disruption or emergency power block cancellations, work may be halted without any financial implications to the client. No compensation or additional claims for idling, remobilization, or standby resources shall be entertained.5. The entire surface treatment process must be sequentially followed.6. All waste, old paint chips, and debris generated from blasting or cleaning shall be collected and disposed of outside the Monorail premises. Total in Figures 0.0 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.