| 1 | Barricading with sal ballies as per design including tying with vertical posts by coconut strings complete in all respect with two horizontal members and vertical supports upto 2.5m centre to centre and for 3 days period including removal and cleaning the site complete in all respect. Height 1.2m upto 1.5m above ground level Complete. |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.(ii) By Mechanical Means (A) In area of non-thorny jungle |
| 3 | Excavation in Soil with Dozer with lead upto 100 mExcavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections. |
| 4 | Excavation for roadway in ordinary rock by deploying a dozer D-50 including cutting and pushing the cut earth to site of embankment upto a distance of 100 m (average lead 50 m), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross- sections with lift upto 1.5 m. |
| 5 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 |
| 6 | Compacting Original GroundLoosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300-1 and 300-2 for embankment construction as per MoRTH Specification Clause 305.3.4 |
| 7 | Laying and spreading available soil in the subgrade on a prepared surface, pulverising, mixing the spread soil in place with rotavator with 2 per cent slaked lime having minimum 70 per cent of contents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per MoRTH Specification Cluase 402.(A) By Manual Means |
| 8 | Granular Sub-base with Well Graded Material (Table 400-1) (A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401.For All Rajasthan except Bikaner, Churu, Hanumangarh and Sri Ganganagar(III) For Grading III Material |
| 9 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406 By Mechanical Means with a lead of 1 Km.By Mechanical Means |
| 10 | Extra rate for carriage of mixed material additional lead from in WMM carriage (ii) 11th Km. to 20th Km |
| 11 | Fillling in foundation trenches as per drawing and MoRTH specification Clause 304.3.7(I) Sand filling |
| 12 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.(ii) Providing and Laying of Interlocking M-30 grade Concrete Block Pavements having thickness 60 mm as per drawings and as per IS 15658:2006.and materials conforming to MoRTH Specification Clause 602 with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks.(a) Category 'A' : Dentated units to key into each other on all four faces Zigzag shape as per IRC:SP:63-2004 |
| 13 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104. (I) P.C.C grade M 10 (1) For All Rajasthan except Bikaner, Hanumangarh and SriGanganagar (i) Nominal mix 1:3:6 |
| 14 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) using truck mounted sprayer including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502. |
| 15 | Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 to 0.40 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503 and IRC-16-2008. |
| 16 | Providing and laying bituminous macadam with Drum type hot mix plant using crushed aggregates of grading as per Table 500-7 premixed with bituminous binder, transported to site with all leads laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per MoRTH Specification Clause 504. (ii) Bitumen (VG-30) |
| 17 | Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per MoRTH Specification Clause 510.Case - II By Mechanical Means(ii) Bitumen (VG-30) |
| 18 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per MoRTH Specification Clause 511.(B) By Mechanical Means Case - II : Type B(ii) Bitumen (VG-30) |
| 19 | Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160\\" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements. |
| 20 | White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per MoRTH specifications Clause 800. Please Enable Macros to View BoQ information |