|
| 1 | Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material wihtin 50 m lead inclusive of de-watering wherever required in cement mortar |
| 2 | Cutting and clearance of jungal, bushes shurbs, Ankara/ Ipomoea ,Julieflora, tipha etc. on canal and bunds in dry/ moist /slushy conditions including disposal as per instruction of the Engineer in charge . Cost of wood has been deducted from rate and thus will be property of contractor after cutting.Thick |
| 3 | Earth work in excavation including loading unloading disposal and dressing of excavated earth with initial load of 50 mt and lift up to 1.5m including dressing of excavated area dewatering wherever required complets in all respect (a) soft/loose soil |
| 4 | Earth work in Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area dewatering wherever required complete in all respect (b) Hard / Dense soil. |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm |
| 6 | Providing and Laying in position of Cement concrete Nominal mix (1:1.5:3) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm |
| 7 | Centering and shuttering for slab, beam, lintels, columns through with or without caps and base including propering and remove. |
| 8 | Side shuttering including propping etc. complete (to achieve finish F 2 for) : for Block joints of foundation ,stilling basins,buckets,aprons,etc. (Non suspended horizontally laid mass concrete) |
| 9 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawingincluding cost of binding wire and all leads and lifts using.Tor or ribbed bars(IS :1786-1985) |
| 10 | Extra labour charges for obstruction in laying & placing the reinforced cement concrete due to reinforcement in foundation, rafts, beams, columns bases, stilling basin ,buckets,aprons,etc (non suspended horizontally laid mass concrete) |
| 11 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. NP-3 (h) 900 mm Please Enable Macros to View BoQ information |