|
| 1 | Cutting and clearance of jungal, bushes shurbs, Ankara/ Ipomoea ,Julieflora, tipha etc. on canal and bunds in dry/ moist /slushy conditions including disposal as per instruction of the Engineer in charge . Cost of wood has been deducted from rate and thus will be property of contractor after cutting. |
| 2 | Excavation including loading unloading disposal and dressing of excavated earth with initial load of 50 mt and lift up to 1.5 mt in dry of moist including dressing of excavated area dewatering wherever required complets in all respect (b) loose and soft soil |
| 3 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm |
| 4 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm |
| 5 | Providing and Laying in position of Cement concrete Nominal mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(For mix design Cement content considered 400 kg/ cum of concrete) 20 mm aggregate |
| 6 | Side shuttering including propping etc. complete (to achieve finish F 2 for : for Block joints of foundation ,stilling basins,buckets,aprons,etc. (Non suspended horizontally laid mass concrete) |
| 7 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawingincluding cost of binding wire and all leads and lifts using.Tor or ribbed bars(IS :1786-1985) |
| 8 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. NP-3 (h) 900 mm |
| 9 | Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and and kankar & murrum for |
| 10 | Supplyingand laying quarrys palls properly graded but notmore than 10cm in size with spreading in required profile including all leads & lifts Please Enable Macros to View BoQ information |