| 1 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary rock (not requiring blasting) BY MECHANICAL MEANS |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils |
| 3 | Carriage of materials Earth, Sand, Lime, Morrum manure or sludge including all lead and lift and loading & unloading. Up to 5 KM |
| 4 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202. |
| 5 | By Mechanical Means Reinforced Cement Concrete |
| 6 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 15 (i) Nomical mix ( 1:2.5 :5) |
| 7 | Plain/reinforced cement concrete in substructure complete as per drawings and MoRTH specification Clauses 1700 and 2200 With 20mm nominal size aggregate R.C.C.grade M25 |
| 8 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and MoRTH specification Clauses 1009,1600 & 2202 |
| 9 | Providing and laying reinforced cement concrete in superstructure as per drawing and MoRTH specifications Clauses 1700, 2302 and 2304 R.C.C M 25 |
| 10 | Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 |
| 11 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 12 | Providing and fixing steel gate, grating , and grills made of angles, tees, square bars, flats,or black pipe with holdfast and fittings complete as per design and drawing including cutting welding and fabrication with priming coat of red oxide |
| 13 | Providing & laying Chequered terrazzo tiles of approved make 22mm thick with marble chips of size upto 6mm, in floors, jointed with neat cement slurry mixed wit pigment to match the shade of tiles including rubbing and polishing complete in all respect as per specification, on 28mm thick bed of C.M. 1:4 : Light shade using shade cement. |
| 14 | Add extra for non slipping 9-12 mm ironite topping tiles |
| 15 | Random rubble dry stone Kharanja under floor. |
| 16 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6( 1-Cement : 6-Sand). |
| 17 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). |
| 18 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix 1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). |
| 19 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in:Cement Mortar 1:6 ( 1-Cement : 6-Sand). |
| 20 | Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) : Raised and cut pointing. Raised and cut pointing. Please Enable Macros to View BoQ information |