|
| 1 | Sub Estimate No. 1: AMC of Meter testing Facility at WTP Kagal. |
| 2 | Calibration & testing of 25mm Master flowmeters @ CWPRS Pune/IDEMI Mumbai including transportation from site to CWPRS Pune/IDEMI Mumbai, installation, dismantling, Testing at CWPRS/IDEMI and re transportation to site etc complete. |
| 3 | Calibration & testing of 80 mm Master flowmeters @ CWPRS Pune/IDEMI Mumbai including transportation from site to CWPRS Pune/IDEMI Mumbai, installation, dismantling, Testing at CWPRS/IDEMI and re transportation to site etc complete. |
| 4 | Calibration & testing of 150 mm Master flowmeters @ CWPRS Pune/IDEMI Mumbai including transportation from site to CWPRS Pune/IDEMI Mumbai, installation, dismantling, Testing at CWPRS/IDEMI and re transportation to site etc complete. |
| 5 | Comprehensive annual maintenance of 25 mm Electro-Magnetic flowmeter during year for each quarter, with quarterly visit for checking /inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material, labour, necessary spares, travel charges, etc. complete.. |
| 6 | Comprehensive annual maintenance of 80 mm Electro-Magnetic flowmeter during year for each quarter, with quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material, labour, necessary spares, travel charges, etc complete. |
| 7 | Comprehensive annual maintenance of 150 mm Electro-Magnetic flowmeter during year for each quarter, with quarterly visit for checking / inspection of normal operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material, labour, necessary spares, travel charges, etc. complete |
| 8 | Comprehensive annual maintenance of testing facility during year for each quarter, with quarterly visit to site for checking /inspection of normal operation of all devices, piping, valves, vessels etc. operation for all parameters, carrying out all necessary repairs cropped up during this quarter, including all material such as Rubber Gaskets , O‘rings, Nuts bolts Valves and any other required spares, labour, necessary spares, travel charges etc complete. |
| 9 | Yearly subscription for software portal and continuous Software upgradation to latest version of MI Flow CAL calibration software. |
| 10 | Sub Estimate No. 2: AMC of Flowmeters @ various locations in industrial area. |
| 11 | Calibration and testing of electromagnetic flow meters @ site by comparison method with ultrasonic master flow meter or any other standard device calibrated and tested at CWPRS/IDEMI |
| 12 | Annual Comprehensive maintenance of full bore electromagnetic flow meter having various sizes on quarterly basis installed at various locations of Centralized water supply scheme at Ahmednagar including checking / inspection of normal operation for all parameters , carrying out all necessary repairs cropped up during the quarter or as per emergency call including all material, labour , necessary spares,travel charges, taxes & duties etc. complete. |
| 13 | Replacement of transmitter with upgradation of software of 900 mm dia. incoming flowmeter @ Jackwell Siddhnerli. Please Enable Macros to View BoQ information |