|
| 1 | (A) Spare For Sugar Bag Stitching MachineChain Attachment Link |
| 2 | M.S. Pin For Fabricated Chain |
| 3 | Bush For Above Chain |
| 4 | State Counter Screw With Nut And Washer |
| 5 | Idler Shaft With Coller |
| 6 | Adjusting Spindle(System) |
| 7 | Chain Slate (Complete) |
| 8 | N.O.N.C. For Double Action Foot Switch |
| 9 | Needle Gb 250 Small |
| 10 | End Bracket driving side with shaft complete |
| 11 | Pressure Foot Lifting Lever |
| 12 | Thread Tension Assembly |
| 13 | Looper Thread |
| 14 | Crank Connecting Rod |
| 15 | Needle Bar Connecting Stand |
| 16 | Idler Roller |
| 17 | Slate Roller |
| 18 | M.S. Pin For Slate Roller |
| 19 | Slate Counter Screw With Nut And Washer |
| 20 | Double Action Foot Switch |
| 21 | Foot Switch Element |
| 22 | Chain End Bracket With Sprocket & Shaft |
| 23 | Driving Chain Set |
| 24 | Throat Plate |
| 25 | Feed Dog |
| 26 | Pressure Foot |
| 27 | Needle For Connecting Link |
| 28 | Needle Bar With Nut |
| 29 | Looper Carrier |
| 30 | Looper Bell Crank Rod |
| 31 | Looper Ball Crank |
| 32 | Bearing Housing |
| 33 | Main Crank Shaft |
| 34 | Sugar Bush |
| 35 | Lifting Bober Housing |
| 36 | Feed Electric Rod |
| 37 | Feed Shaft Connection |
| 38 | Screw Set |
| 39 | Bush Set |
| 40 | Feed Shaft Crank |
| 41 | Arm Shaft Crank(Rear) |
| 42 | Looper Carrier Rod Head |
| 43 | Bearing Housing Bush |
| 44 | Arm Shaft Crank |
| 45 | Ball Bearing For Main Crank Shaft |
| 46 | Torg (U Shaped) U-Clamp |
| 47 | Lifting Lever Bolt (Stud) |
| 48 | Pressure Foot Hanger |
| 49 | Looper St 26x |
| 50 | Conveyer Chain Complete With Slates |
| 51 | Needles Portable Hand Stitching Machine 25/200 |
| 52 | Looper Shaft |
| 53 | Looper Eccentric Cam |
| 54 | Cam For Squre Bush |
| 55 | Pressure Bar |
| 56 | Spring For Pressure Foot Lever |
| 57 | Stitching Head For Sugar Bag Stitching Machine |
| 58 | Looper Ball Joint Assembly |
| 59 | Feed Bar |
| 60 | Looper Avoid Ecentric Assembly |
| 61 | Looper Drive Connecting Assembly And Ecentric Assembly |
| 62 | Stitch Regulating Stand Assembly |
| 63 | Needle Lever Assembly |
| 64 | Looper Drive Lever |
| 65 | Feed Lift Ecentric Fork Assembly |
| 66 | Looper Thread East Off Hook Assembly |
| 67 | Guide Fork |
| 68 | Shall Assembly |
| 69 | Driving Sprocket 16 Teeth |
| 70 | Thread Adjuster |
| 71 | Needle Lever Ball Link |
| 72 | Feed Drive Ecentric Assembly |
| 73 | Frame Thread Eyelet Assembly |
| 74 | Needle Bar Connection Assembly |
| 75 | Looper Rocker Assembly |
| 76 | Feed Rocker |
| 77 | Dye Pressed Strip Fitted With Wood |
| 78 | Return Roller |
| 79 | Return Roller Shaft |
| 80 | Looper Ecentric Assembly |
| 81 | Sleeve Assembly |
| 82 | Rocker For Looper Drive Lever Shaft |
| 83 | Lifter Pressure Bar Assembly |
| 84 | Pvc Roller For Chain Slate |
| 85 | M.S. Pin For Above Slate |
| 86 | Fork For Connection guide |
| 87 | Base Foot lifting lever shaft |
| 88 | Holder for Looper Connection |
| 89 | Lever for Looper drive |
| 90 | Connection for Needle Bar |
| 91 | Link Assembly for Connection |
| 92 | Connection Thread |
| 93 | Rivit pin as per sample |
| 94 | Shaft for conveyer support complete |
| 95 | M.S. Chain for conveyer |
| 96 | Driving chain for conveyer |
| 97 | (B) Spare For Sugar StackerM.S. Slate With Roller (Complete) |
| 98 | Wooden Slate |
| 99 | Driving Chain |
| 100 | Driving Chain Sprocket 1\\" Pitch And 33 Teeth |
| 101 | Driving Chain Sprocket 1\\" Pitch And 19 Teeth |
| 102 | Sprocket 7 Teeth |
| 103 | Main Housing Driving Side |
| 104 | M.S. Roller For Slates |
| 105 | S.S. Washer For Stacker |
| 106 | Cast Steel Sprocket No. Of Teeth 13,Dia 12.5\\", Groove 1\\", Pitch 1.5\\", Shaft Size 2\\", Chain Centre Distance 3\\" |
| 107 | Carriage bolt with nut & washer size 3/8\\" × 2 ½\\" (complete) |
| 108 | M.S. Main Chain for Stacker as per sample |
| 109 | Split pin 1/8\\"Í1.5\\" |
| 110 | (C) General overhauling/repairing with A.M.C. (You will provide 01 to 02 visit in monthly basis during crushing season without any charges. During AMC period, essential spares will be provide by mill & You will responsible for payment of wages/any compensation or casualty to your staff during job execution. Factory will not be responsible for the same.)(I) Sugar bag stitching machines for crushing season |
| 111 | (ii) Sugar bag stacker for one year. CHIEF CHEMIST Please Enable Macros to View BoQ information |