| 1 | Demolishing stone rubble masonry including stacking of useable material and disposal of unuseable material wihtin 50 m lead inclusive of de-watering wherever required in cement mortar |
| 2 | Dismantling Cement Concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required. |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5 m in dry or moist including dressing of excavated area dewatering wherever required complete in all respect (b) Hard / Dense soil. |
| 4 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm |
| 5 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20mm |
| 6 | Providing and Laying in position of Cement concrete Nominal mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(For mix design Cement content considered 400 kg/ cum of concrete) 20 mm aggregate |
| 7 | Centering and shuttering for slab, beam, lintels, columns through with or without caps and base including propering and remove. |
| 8 | Side shuttering including propping etc. complete (to achieve finish F 2 for : for Block joints of foundation ,stilling basins,buckets,aprons,etc. (Non suspended horizontally laid mass concrete) |
| 9 | Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawingincluding cost of binding wire and all leads and lifts using.Tor or ribbed bars(IS :1786-1985) |
| 10 | Extra labour charges for obstruction in laying & placing the reinforced cement concrete due to reinforcement in foundation, rafts, beams, columns bases, stilling basin ,buckets,aprons,etc (non suspended horizontally laid mass concrete) |
| 11 | Providing, laying and fixing in position RCC spun or hume pipe withcollars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. NP-3 (h) 900 mm Please Enable Macros to View BoQ information |