| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. (b)Thick |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect in. (b) Hard/dense soil. |
| 3 | Centring and shuttering for slabs, beams,lintels,columns,trough with or without caps and base including proping and remove. |
| 4 | Side shuttering including propping etc. complete (to achieve finish F 2 for :(c)Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. |
| 5 | Supplying of MS reinforcement including labour charges for bending, binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars(IS :1786-1985) |
| 6 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 7 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm |
| 8 | Providing and Laying in position of Cement concrete Design mix M-25 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto(For mix design Cement content considered 420 kg/ cum of concrete) 20 mm |
| 9 | Extra labour charges for obstruction in laying & placing the reinforced cement concrete due to reinforcement in Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas,Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc |
| 10 | Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. NP-3 (e) 900 mm |
| 11 | (f) 1000 mm |
| 12 | Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-watering wherever required and all applicable taxes and levies etc. complete in all respect (b) Mixed strata muck Please Enable Macros to View BoQ information |