|
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: SE EDC, Chandauli, PuVVNL, Varanasi. Name of Work : Line shifting work for the widening and strengthening of the Sakaldiha Canal Road to Sakaldiha Block Road by the E.E., P.D., P.W.D., Chandauli within the jurisdiction of the EDD-Sakaldiha, specifically under EDSD-IInd, Bhupauli, and carried out under the \\"Deposit Scheme.\\" Tender No.: 04/EDC(C)/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Details Item Code / Make Qty. Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency RATE In Figures To be entered by the Bidder (excluding GST) Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT (excluding GST) Rs. P TOTAL AMOUNT(excluding GST) Rs. P. (col.4 X col.13) TOTAL AMOUNT (excluding GST)In Words |
| 2 | Decentralized Materials- B |
| 3 | Clamp for T/Off and V-Clamp |
| 4 | Brabed Wire |
| 5 | Stone Pad |
| 6 | Danger Board |
| 7 | I-Hook for Suspension Set |
| 8 | I-Hook for Deadend Set |
| 9 | F-Bracket |
| 10 | Nut & Bolt |
| 11 | T/F Clamp for 10KVA |
| 12 | Labour & Maintainance charges - C |
| 13 | Work of Carriage of 11 meter ST pole with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 14 | Work of Carriage of 8.5 meter PCC pole with fitting from store centre Sahupuri/Rajatalab to site with loading & unloading. |
| 15 | Work of Erection of Single Pole with 8.5 meter PCC / 11 meter ST Pole with digging & Fitting of fixtures with accessories as per RESSPO standard. |
| 16 | Work of Carriage & Erection of ACSR Dog Conductor with all accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 17 | Work of Carriage & Erection of ACSR Weasel Conductor with all accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 18 | Work of Carriage & Erection of LT ABC (3x95+1x50+1x16mm) with all accessories including loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 19 | Work of Carriage & Erection of Earthing Complete with loading & unloading from store centre Sahupuri/Rajatalab to work site. |
| 20 | Work of Carriage & Erection of Stay Complete with loading & unloading as per RESSPO standard. |
| 21 | Work of Stay Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 22 | Work of Pole Grouting including cement, Sand, Concrete in the ratio of 1:4:8 as per RESSPO standard. |
| 23 | Work of Dismentaling of 10 KVA transformer on Single Pole as per RESSPO standard. |
| 24 | Work of Dismentaling of ST Pole as per RESSPO standard. Total in Figures 0.0 0.0 Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |