| 1 | Transportation andcarriage of material bytripper truck lead beond 5kms upto 10km. Includingloading, unloding.(i) Lime, moorum,Building, rubbish |
| 2 | Earthwork in excavationby mechanical means(hydraulic excavator)/manual means infoundation pipelinetrenches drain (notexceeding 1.5 m in widthor 10 sq.m. on plan)including dressing of sidesand ramming of bottomslift upto 1.5 m includinggetting out the excavatedsoil and disposal of surplusexcavated soil as directedwithin a lead of 50 m.;Allkinds of soil |
| 3 | Rubble packing with hardlaterite stone under floorsincluding wateringramming and consolidatingetc. in pipeline trenchesand other foundationscomplete. |
| 4 | Providing and laying inposition cement concrete 1:2:4 (1 cement : 2 coarsesand: 4 graded granitic orbasaltic stone aggregate 40m nominal size) excludingcost of centering shutteringand finishing :;All worksupto plinth level |
| 5 | Steel work in built uptubular (round square orrectangular hollow tubesetc.) (Square HollowSection (SHS) IS4923/Rectangular HollowSection (RHS) IS4923/Circular Hollow Section(CHS) IS1161 closedStructural Steel of (SAILTATA. VIZAG JSWAPOLLO Steel Ltd.) make(Min Yeild Stress 310Mpa)) trusses etc.including cutting hoistingfixing in position andapplying a priming coat ofapproved steel primerincluding welding andbolted with special shapedwashers etc. complete. |
| 6 | Steel work in singlesections (SAIL TATA.VIZAG & using electrodesof Ador or ES4B or DehSecheron make only)including cutting hoistingfixing in position andapplying a priming coat ofred lead paint.;In R.S.joists channels angles tees |
| 7 | Painting two or more coats(excluding priming coat)with superior quality readymixed paint for steel workof approved brand &manufacture in all shadeson new work to give aneven shade. |
| 8 | Providing and fixing G.I.chain link mesh 6.35cm x6.35 cm x 10 gauge (2.5” x2.5” x 10 gauge) fixed withangle iron posts and strutsby G.I. or M.S. staples at20cms apart with weldingwith the iron posts (placedat 3 meters centre tocentre) including providingbarbed wire stiffeners(shall weigh 9.33 kg. per100 meters minimum) attop and bottom withbarbed wire stiffers bybinding wires at 50cmscentre to centre complete as per the direction of theEngineer – in – charge(angle iron posts strutsearthwork and concrete forfencing posts and struts tobe paid separately) |
| 9 | Laterite masonry in neatlydressed stones for 23 cmsthick masonry walls in c.m. 1 : 4 (1 cement : 4coarse sand in foundationupto plinth level |
| 10 | Extra for laterite masonryin all sizes insuperstructure from floor Ilevel upto floor V level. |
| 11 | Providing and laying uptofloor five level cementconcrete 1:2:4 (1 cement: 2coarse sand: 4 gradedgranitic or basaltic stoneaggregate 20 mm nominalsize) including smoothfinishing to exposedsurfaces with cementmortar 1:3 (1 cement: 3fine sand) includingcentering and shutteringetc.;String courses copingsbedplates anchor blocksplain window sills and thelike. |
| 12 | 18mm cement plaster intwo coats under layer12mm thick cement plaster1:5 ( 1 cement : 5 coarsesand) and top layer 6mmthick with cement plaster1: 3 (1 cement : 3 coarsesand) finished with sponge. |
| 13 | Providing and fixingprefabricated compoundgate of G.I. pipes 40 – 50mm dia (medium) with12mm M.S. square bars ofG.I. pipes grill work as perdrawing includingproviding & fixing lockingarrangements pintals holdfast embedded in cementconcrete 1:2:4 (1 cement: 2coarse sand : 4 granitic orbasaltic aggreate 20mmnominal size) including applying priming coat withready mixed red lead paintand painting 2 or morecoats with superior readymixed paint of approvedbrand and manufacture inall shades as per directioncomplete. |
| 14 | Painting three or morecoats with acryllic exteriorpaint of approved brandand manufacture (Such asDulex/ Asian Paints/Sherwin Willians)including applying onecoat of cement primer andone coat of surfacetreatment etc. complete. |
| 15 | Dismantling the tile workin floors and roofs laid incement including stackingof materials within 50meters lead for thicknessof tiles 10mm to 25mm. |
| 16 | Kotah stone slab flooringover 25 mm thick in risersof steps skirtings dado &pillars laid on 12mm(average) thick cementmortor 1:3 (1 cement : 3coarse sand) & jointedwith grey cement slurrymixed with pigment tomatch the shade of the slabincluding rubbing &polishing complete. |
| 17 | Providing and fixing inposition S.S. hand rail inmain stair case and landingas per approved designshown in the drawingincluding bending handrailpipe to proper shape incurves with specials etc.complete. |
| 18 | Applying priming coatwith ready mixed red leadpaint of approved brandand manufacture on steelwork. |
| 19 | Providing and fixing Kotastone tread tiles 35mmthick in single piece with rounded of nosing antiskidgroove laid on andincluding 20mm (average )thk bed of cement slurryincluding pointing withpigmented cement slurry tomatch the shade of the slabcleaning etc. complete. Please Enable Macros to View BoQ information |