|
| 1 | Providing & Installing the Mini Play House of make ARIHANT /KOMPAN/ LANDSCAPE STRUCTURES /OK PLAY/LEO/ KAALIA. of size 6.0x1.80mtr with Slide. Main Frame made of Round 80 NB Pipe Having min \\"B\\" class G.J. pipe. All the pipes should be ISI Marked (as per the IS 1239/2004) & of reputed brand. Ensuring the strength. Durability, stability & long life to the kids structure with safety as paramount Deck having 1035mm x750mm with collar of 65mm size made of perforated sheet. Hydraulic Precision punched holes made of min 10mm NB with sheet thickness of approx. 2.5mm. Components:- FRP (Fiber Reinforced Plastic) Main Sunshine Line designer Roof having min 2- 4 layers (approx.4mm thickness) with bright colours being UV resistant ladder main frame made of round pipe 25mm NB pipe & Ladder rungs made of 15mm N.B. pipe having width of 400min a 70mm(approx.). All the pipes should be ISI marked (as per the IS1239/2004) & of reputed brand. Tree climber made of main frame pipe of 25mm NB round pipe & rungs made of 20min NB round pipe. All the pipes should ben ISI marked(as per the IS 1239/2004) & of reputed brand Spring coil climber: made of main frame pipe of 25mm NB round pipe & springs made of 20mm NB round pipe. All the pipes should be ISI marked(as per the IS. 1239/2004) & of reputed brand. A Rotomolded plastic LLDPE made Line panel with UV stabilized color fading resistant. Having size of 1035mm x 750mm & thickness of 70mm heavy & strong for long term durability & great aesthetic look 1035mm(L)x750mm(W) having wall thickness 70m. & finish, Safety panel fitted on M.S round pipe 20mm N.B. with size of Slide having height of 1220mm approx.. & length approx.. 2mtr made of metallic GI sheet of high strength having width of 400mm mounted on M.S angle support of 4-0x40x4mm & 5nos angle supports & 20mm. N.B. round pipe hand rail, The ladder step of metallic slide should made of M.3 rectangular pipe of 70x23mm in minimum thickness of 2mm with vertical hand rift support of size 20mm N.B GI p:pe with other necessary supporting pipes. The complete structure mini play house should be powder coated with minimum powder coating thickness of 60-60 microns. Safety panel/top canopy should be also attached with help of colorful nylon clamps. Accessories: Nut bolts- All approved Gl nut bolts Galvanised Iron with High tensile Strength. Kid capacity 2-8 Nos. All complete as per the direction of engineer in charge or as per approved drawing & design given by manufacturer including earth work, c:c work up to plinth level, c:c block 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) of required size as per department / manufacturers specifications and guidelines including maintenance cost for 1st Year. |
| 2 | Providing and fixing of DOUBLE ARCH SWING of make ARIHANT/KOMPAN/LANDSCAPE STRUCTURE/ OK PLAY / LEO/ KAALIA. The arch shaped side frame of the double arch swing is made up of 80 NB GI pipe and top pipe is made up of 50 NB GI pipe. The frame is powder coated to give an esthetic look. Seats- Belt Type Seats made of Synthetic Rubberized material/Fiber reinforced fabric materials of Virgin Reinforced material. The belt seat is suspended on 6 mm rubber coated Gl chain. The ball bearings are mounted inside a specially designed nylon clamp. All complete as per the direction of engineer in charge or as per approved drawing & design given by manufacturer including earth work, c:c work up to plinth level, c:c block 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 20mm nominal size) of required size as per department / manufacturers specifications and guidelines including maintenance cost for 1st Year. |
| 3 | Providing & Installing the SEA SAW DOUBLE of make ARIHANT /KÖMPAN/ LAND SCAPE STRUCTURES /OK PLAY/LEO/ KAALIA of size 2.0x2.50mtr.Main Frame: made of see saw made of 50mm NB pipe with planks made of 40mm NB pipe and supports made of 20mm N.B. pipe, all the G.I pipes should be \\"B\\" class & ISl marked (as per the IS 1239/2004)& of reputed brand make & Ensuring the Strength, durability, stability & long life to the kids structure with safety as paramount. Seats - Seat Made of FRP (Fibre Reinforced Plastic), duly UV resistant colors, all chemicals in the FRP material should be best quality, the Fibre Mat of 450GSM to be used for strength & stability with supporting frame. FRP Seat Sıze approx.) 10\\"(L) x 8\\" (W) with back rest. The complete structure see saw double should be powder coated with minimum powder coating thickness of 60-80 microns accessories: 1Nut bolts- All approved GI nut bolts Galvanised Iron with High tensile Strength Kid capacity -4 nos. All complete as per the direction of engineer in charge or as per approved drawing & design given by manufacturer including earth work, c:c work up to plinth level, c:c block 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) of required size as per department / manufacturers specifications and guidelines including maintenance cost for 1st Year. |
| 4 | Providing & Installing the SINGLE WAVE CLIMBER of make ARIHANT /KOMPAN/ LAND SCAPE STRUCTURES/OK PLAY/LEO/KAALIA of size 1.75x0.80mtr. Main Frame: Main Frame of single wave climber pipe made of round 32mm NB pipe (Must be min in GI \\"B\\" class pipe) and rungs made of 20mm N.B. Pipe - 'U' Shaped bended( will thickness approx. min 1.5mm - 2.2.mm only), All the pipes should be ISI marked(as per the IS 1239/2004 & of reputed brand & Ensuring the Strength, durability, stability & long life to the kids structure with safety as paramount. The complete structure single wave climber should be powder coated with minimum powder coating thickness of 60-80 microns Accessories: Nut bolts- All approved Gl nut bolts Galvanised Iron with High tensile Strength Kid Capacity - 2 to 4 Nos. All complete as per the direction of engineer in charge or as per approved drawing & design given by manufacturer including earth work, c:c work up to plinth level, c:c block 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) of required size as per department / manufacturers specifications and guidelines including maintenance cost for 1st Year. |
| 5 | Providing and fixing of TODDLER SWING of make ARIHANT/KOMPAN/LANDSCAPE STRUCTURE/OK PLAY/LEO/KAALIA. In the toddler swing the center support is made up of 80 NB GI pipes. The horizontal bars are made up of 50 NB powder coated Gl pipes. The bucket seats of the toddler swing are made of rubber with anti-skid. The ball bearings are mounted inside specially designed nylon balls. The rubber seat is affixed on 6 mm thick Gl chain. The seats are made with full care so that the child does not fall from it while swinging. All complete as per the direction of engineer in charge or as per approved drawing & design given by manufacturer including earth work, c:c work up to plinth level, c:c block 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size) of required size as per department / manufacturers specifications and guidelines including maintenance cost for 1st Year. |
| 6 | SCHEDULE -B Regular maintenance for three years (including free maintenance for 1 year) of all the newly installed children play equipment in 09 Nos. location in DDA parks as per schedule B consists of the following :-a) Replacement/repair of parts of equipment in case of theft/ vandalism.b) Check and set right/replacement for worn bearings, misaligned moving points, adjust/tighten loose parts, covers, seats, foundation and flooring.c) Tightening nuts/bolts/screws i/c welding of various parts/joints of equipment wherever required.d) Calibration of Instrument every three months.e) Priming coat & painting coat, if required.f) Lubrication/oiling every 15 days.g) Inspect and adjustment of drive, timing and running belts.h) Replacement of damaged parts & rectification of any other defects observed as per the direction of the Engineer-in-charge except : i. Due to Force majeure or ii. Abnormally bad weather, serious loss or damage by fire or iii. Damage due to the act of god or iv. Any other cause which is in the absolute discretion of the Engineer-in-charge is beyond the contractor's control. |
| 7 | Annual maintenance of equipments to be carried out by the agency free of cost for First year, after the date of completion of the work as per schedule-A, all complete as per the direction of Engineer-in-Charge.a.) First Year (Free of Cost).(complete 1 set) |
| 8 | b.) At the end of 2ndyear from the date of Completion of the Work (complete 1 set) |
| 9 | c.) At the end of 3rd year from the date of Completion of the Work (complete 1 set) |
| 10 | Terms & Conditions:1. The agency shall regularly inspect & upkeep the equipment in working condition as required at all times during the contract period.2. The complaint as and when it occurred shall be attended to within 3 days during 3 years maintenance period, failing which a penalty of @ Rs. 2000.00 per day shall be imposed and shall be recovered.3. If the equipment (or its parts) is stolen due to negligence in maintenance by the agency, the agency must replace the stolen equipment/parts. No payment will be made to the agency for this replacement (i.e., the agency bears the full cost of replacement).4. The performance guarantee of 5% submitted by the agency shall be released after recording of final completion certificate (i.e. after completion of 3-year maintenance period).5. The provisional completion shall be recorded by the competent authority separately for the installation of children play equipment. However, the final completion certificate shall be recorded by the competent authority after successful completion of 3-year maintenance period.6. The security deposit withheld @2.5% of the gross amount of each Running Account (R/A) Bill/ Final Bill till the sum deducted will amount to security deposit of 2.5% of the tendered amount of the work shall be released after recording of final completion certificate by the Competent Authority (i.e. after completion of 3-year maintenance period).7. An additional amount equal to 40% of the installation cost of equipment (i.e. new equipment from S.No. 1 to 5 of schedule-A) shall be withheld apart from security deposit from each Running Account (R/A) bill, against warranty. This amount shall be proportionately released year wise after successful completion of each year of the 3-year maintenance period (including both the free and paid maintenance periods). Please Enable Macros to View BoQ information |