|
| 1 | Supply of HTLS Conductor |
| 2 | Supply of 132KV HTLS Conductor as per Technical specification |
| 3 | Supply of Hardware fittings complete with all accessories suitable for HTLS conductor as per specification |
| 4 | Supply of Single Suspension hardware fittings complete with all accessories as per specification |
| 5 | Single Tension hardware fittingscomplete with all accessories as per specification |
| 6 | Double Suspension hardware fittings complete with all accessories as per specification |
| 7 | Double tension hardware fittings complete with all accessories as per specification |
| 8 | Dead End Assembly as per specification |
| 9 | Vibration Damper as per specification |
| 10 | Jumper Socket as per specification |
| 11 | Mid Span Joints as per specification |
| 12 | Repair Sleeves as per specification |
| 13 | String of Porcelain disc Insulator as per specification |
| 14 | 120kN |
| 15 | Supply of Current Transformers alongwith hardware fittings and clamps & connectors |
| 16 | 132kV Single Phase Multicore CT (1000-800-400 A/1-1-1-1-1) (3 Nos. for Dhaligaon and 3 Nos. for Barnagar) (2 Nos. to be kept as spare at both GSS) |
| 17 | Mandatory spares |
| 18 | Hydraulic Compressor Machine for offered HTLS Conductor (Motorised) |
| 19 | Dies for T- Clamp for offered HTLS conductor |
| 20 | Dies for Dead – End for offered HTLS conductor |
| 21 | Single End Socks Mesh Type |
| 22 | Roller for stringing of offered HTLS conductor |
| 23 | Mid-Span/Compression Joint |
| 24 | Double tension hardware fittings complete with all accessories as per specification |
| 25 | Supply of HTLS Conductor |
| 26 | Supply of 132KV HTLS Conductor as per Technical specification |
| 27 | Supply of Hardware fittings complete with all accessories suitable for HTLS conductor as per specification |
| 28 | Supply of Single Suspension hardware fittings complete with all accessories as per specification |
| 29 | Single Tension hardware fittingscomplete with all accessories as per specification |
| 30 | Double Suspension hardware fittings complete with all accessories as per specification |
| 31 | Double tension hardware fittings complete with all accessories as per specification |
| 32 | Dead End Assembly as per specification |
| 33 | Vibration Damper as per specification |
| 34 | Jumper Socket as per specification |
| 35 | Mid Span Joints as per specification |
| 36 | Repair Sleeves as per specification |
| 37 | String of Porcelain disc Insulator as per specification |
| 38 | 120kN |
| 39 | Supply of Current Transformers alongwith hardware fittings and clamps & connectors |
| 40 | 132kV Single Phase Multicore CT (1000-800-400 A/1-1-1-1-1) (3 Nos. for Dhaligaon and 3 Nos. for Barnagar) (2 Nos. to be kept as spare at both GSS) |
| 41 | Mandatory spares |
| 42 | Hydraulic Compressor Machine for offered HTLS Conductor (Motorised) |
| 43 | Dies for T- Clamp for offered HTLS conductor |
| 44 | Dies for Dead – End for offered HTLS conductor |
| 45 | Single End Socks Mesh Type |
| 46 | Roller for stringing of offered HTLS conductor |
| 47 | Mid-Span/Compression Joint |
| 48 | Double tension hardware fittings complete with all accessories as per specification |
| 49 | Preliminary Survey including measurements of vertical clearance at maximum sag point, indentification and replacement including supply against damaged stubs, tower members and earthing and collection of all required documents required for obtaining statutory permission from Railways, Highway Authorities and other Government bodies. |
| 50 | Paving, Stringing, Tensioning, Clamping, Jointing, etc. of HTLS Conductor using tension puller machine as per specification requirements in all the phases including transportation of conductor from store,hoisting of insulators, fitting of all necessary hardware and accessories, i.e. fittings, armour rods, vibration damprs, supervision of installation and stringing, etc |
| 51 | Dismantling of existing clamps, connectors and accessories from Gantry to the Busbar at the terminal bays of respective substations and reconnection with HTLS conductor with compatible connectors and clamps-both supply of materials and erection complete in all respects |
| 52 | Dismantling of existing conductor of the transmission line, re-rolling on empty drums, removing of hardware fittings, insulators and accessories, loading and unloading, trasnportation to AEGCL store. |
| 53 | Erection by retrofitting of existing mounting structure, testing & commissioning of Current transformers including laying & terminating of control cables, etc as required for completion of job and associated civil works (2 nos. of spare CT to be only tested) |
| 54 | 132kV Single Phase Multicore CT (1000-800-400 A/1-1-1-1-1) (3 Nos. for Dhaligaon and 3 Nos. for Barnagar) Please Enable Macros to View BoQ information |