|
| 1 | New Electricity Connection and Electrification Related to Jhatpat portal and Deposit scheme from 01kv upto 20 kv |
| 2 | Safe Loading, Carriage & Unloading of STP 11 Mtr Pole From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 3 | Safe Loading, Carriage & Unloading of PCC 11 Mtr Long From Electricity Store Center Maharajganj to Work SiteDistance 70-110 km |
| 4 | Safe Loading, Carriage & Unloading of PCC 8.5 Mtr Long From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 5 | Safe Loading, Carriage & Unloading of ACSR Weasel conductor From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 6 | Safe Loading, Carriage & Unloading of ACSR Dog conductor From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 7 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x50+1x35+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 8 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x95+1x70+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 9 | Safe Loading, Carriage & Unloading of 11 kv line material (Cross arm, Dics & pin insulator with all fittings). |
| 10 | Safe Loading, Carriage & Unloading of Earthing Complete from Electricity Store Center Maharajganj to Work Site |
| 11 | Safe Loading, Carriage & Unloading of Stay Set Complete from Electricity Store Center Maharajganj to Work Site |
| 12 | Safe Loading, Carriage & Unloading of LT Distribution Box from Electricity Store Center -Maharajganj to Work Site |
| 13 | Safe Loading, Carriage & Unloading of 10 KVA T/F from Electricity Store Center Maharajganj to Work Site |
| 14 | Safe Loading, Carriage & Unloading of 16KVA T/F from Electricity Store Center Maharajganj to Work Site |
| 15 | Safe Loading, Carriage & Unloading of 25 KVA T/F from Electricity Store Center Maharajganj to Work Site |
| 16 | Safe Loading, Carriage & Unloading of 63 KVA T/F from Electricity Store Center Maharajganj to Work Site |
| 17 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of 11 mtr. ST Pole as per drawing. |
| 18 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (8.5 Mtr Long) as per drawing. |
| 19 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (11 Mtr Long) as per drawing. |
| 20 | Erection of 11 mtr Single ST Pole with all accessories (Cross arm, pin insulator with pin, F-bracket etc.) as per specification. |
| 21 | Erection of 8.5 mtr Single PCC Pole with all accessories (Cross arm, 11KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 22 | Erection of 11 mtr Single PCC Pole with all accessories (Cross arm, 11 KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 23 | Erection of 11 mtr Double ST Pole structure with all accessories ( 11 KV Disc with Disc fittings, Pin insulator with pin etc.) as per specification. |
| 24 | Erection of 8.5 mtr Double PCC Pole structure with all accessories (11 KV Disc with Disc fittings, 11 KV Pin insulator with pin etc.) as per specification. |
| 25 | Erection of 11 mtr Double ST Pole DT structure with all accessories (11 Disc with disc Fitting, 11 KV pin insulator with pin etc.) as per specification for intallation of 25/63 KVA Transformer. |
| 26 | Erection of 8.5 mtr Double PCC Pole DT structure with all accessories (Top channel, droper channel , Fuse Set, 11 Disc Fitting, 11 KV pin insulator with pin, T/F MS base Angle etc.) as per specification for intallation of 25/63/ KVA Transformer. |
| 27 | Grouting of 11 mtr ST Pole With Material as per specification. |
| 28 | Plinth of 11 mtr ST Pole as per specification. |
| 29 | Grouting of 11 mtr PCC Pole With Material as per specification. |
| 30 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 31 | Earthing Complete of 11 Mtr ST Pole as per specification. |
| 32 | Earthing Complete of 11 Mtr PCC Pole as per specification. |
| 33 | Earthing Complete of 8.5 Mtr PCC Pole as per specification. |
| 34 | Laying sagging and binding of of ACSR Weasel Conductor on eracted pole |
| 35 | Laying sagging and binding of of ACSR Dog Conductor on eracted pole |
| 36 | Laying of guarding between erected ST Poles as per specification. |
| 37 | Laying of LT ABC of Size (3x50+1x35+1x16) on erected LT. Pole |
| 38 | Laying of LT ABC of Size (3x95+1x70+1x16) on erected LT. Pole |
| 39 | Erection of Distribution Box on erected pole as per specification |
| 40 | Installation of 10 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 41 | Installation of 16 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 42 | Installation of 25 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 43 | Installation of 63 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 44 | Concreting of stay set as per specification |
| 45 | Intallation of Stay set complete as per specification |
| 46 | Providing and Installation of M.S. Cross brassing angle as per specification on erected double pole. |
| 47 | Providing and Installation of T/F MS base Angle of size 75x75x6x2028mm with clamp on erected double pole. |
| 48 | Providing and Installation of 11 KV Fuse set complet in all respect as per specification on erected double pole. |
| 49 | Providing and Installation of Eye bolt as per specification. |
| 50 | Providing and Installation of Eye Hook as per specification. |
| 51 | Providing and Installation of Suspension Clamp |
| 52 | Providing and Installation of Dead End Clamp |
| 53 | Providing and Installation of Peircing Connector |
| 54 | Providing and Installation of V-type X-arm holding clamp with nut bolt |
| 55 | Providing and Installation of LT PVC Cable (4x25 Sqmm) as Per specification. |
| 56 | Providing and Installation of LT PVC Cable (3.5x70 Sqmm) as Per specification. |
| 57 | Providing and Installation of F bracket on erected PCC/ST Pole |
| 58 | Providing and Installation of Top Channel Clamp |
| 59 | Providing and Installation of T-Off Channel Clamp |
| 60 | Providing and Installation of MS Guarding Angle with clamp |
| 61 | Providing and Installation of 6 SWG GI Wire as per site requirements |
| 62 | Providing and Installation of 8 SWG GI Wire as per site requirements |
| 63 | Providing and Installation of Stay Clamp |
| 64 | Providing and Installation of Droper Angle Clamp |
| 65 | Providing and Erection of Chemical Earthing as Per specification. |
| 66 | Providing and Installation of Top/T-off/Droper Chanel Clamp with nut bolts and washer |
| 67 | Providing and Installation of Danger Board on erected PCC/ST Pole |
| 68 | Providing and Installation of Nut & Bolt |
| 69 | Providing and Installation of PG Clamp |
| 70 | Providing Alu. Paint and painting of ST Pole etc |
| 71 | Providing of Red Oxide Paint and painting of ST Pole etc |
| 72 | Providing and Installation of GS/GI Earth Wire |
| 73 | Providing and Installation of Stone Pad 300x300x75mm |
| 74 | Tree Branch Cutting/chopping along the HT/LT Line route |
| 75 | New Electricity Connection and Electrification Related to Nivesh Mitra portal and Deposit scheme from above of 21 kv |
| 76 | Safe Loading, Carriage & Unloading of STP 11 Mtr Pole From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 77 | Safe Loading, Carriage & Unloading of PCC 11 Mtr Long From Electricity Store Center Maharajganj to Work SiteDistance 70-110 km |
| 78 | Safe Loading, Carriage & Unloading of PCC 8.5 Mtr Long From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 79 | Safe Loading, Carriage & Unloading of ACSR Weasel conductor From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 80 | Safe Loading, Carriage & Unloading of ACSR Dog conductor From Electricity Store Center Maharajganj to Work Site Distance 70-110 km |
| 81 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x50+1x35+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 82 | Safe Loading, Carriage & Unloading of LT AB Cable of (3x95+1x70+1x16) Sqmm size-2km from Electricity Store Center-Maharajganj to Work Site |
| 83 | Safe Loading, Carriage & Unloading of 11 KV XLPE Cable of size (3x70) Sqmm from Electricity Store Center-Maharajganj to Work Site |
| 84 | Safe Loading, Carriage & Unloading of 11 KV XLPE Cable of size (3x120x185) Sqmm from Electricity Store Center-Maharajganj to Work Site |
| 85 | Safe Loading, Carriage & Unloading of 11 KV VCB from Electricity Store Center-Maharajganj to Work Site |
| 86 | Safe Loading, Carriage & Unloading of 11 kv line material (Cross arm, Dics & pin insulator with all fittings). |
| 87 | Safe Loading, Carriage & Unloading of Earthing Complete from Electricity Store Center Maharajganj to Work Site |
| 88 | Safe Loading, Carriage & Unloading of Stay Set Complete from Electricity Store Center Maharajganj to Work Site |
| 89 | Safe Loading, Carriage & Unloading of LT Distribution Box from Electricity Store Center -Maharajganj to Work Site |
| 90 | Safe Loading, Carriage & Unloading of 11 KV PPMC from Electricity Store Center Maharajganj to Work Site |
| 91 | Safe Loading, Carriage & Unloading of 63 KVA T/F from Electricity Store Center Maharajganj to Work Site |
| 92 | Safe Loading, Carriage & Unloading of 100 KVA T/F from Electricity Store Center Maharajganj to Work Site |
| 93 | Safe Loading, Carriage & Unloading of 250 KVA T/F from Electricity Store Center Maharajganj to Work Site |
| 94 | Safe Loading, Carriage & Unloading of 11 KV CT/PT From Electricity Store Center Maharajganj to Work Site |
| 95 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of 11 mtr. ST Pole as per drawing. |
| 96 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (8.5 Mtr Long) as per drawing. |
| 97 | The Excavation of Foundation Pit in Mix Soil/ Normal Soil/ Soft soil &hard rock as per site condition and its back filling and leveling etc. The size of the pit will be (750 X 450) mm and having depth of 1/6 of the full length of the support of PCC Pole (11 Mtr Long) as per drawing. |
| 98 | Erection of 11 mtr Single ST Pole with all accessories (Cross arm, pin insulator with pin, F-bracket etc.) as per specification. |
| 99 | Erection of 8.5 mtr Single PCC Pole with all accessories (Cross arm, 11KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 100 | Erection of 11 mtr Single PCC Pole with all accessories (Cross arm, 11 KV Pin insulator with pin, F-bracket etc.) as per specification. |
| 101 | Erection of 11 mtr Double ST Pole structure with all accessories ( 11 KV Disc with Disc fittings, Pin insulator with pin etc.) as per specification. |
| 102 | Erection of 11 mtr Double PCC Pole structure with all accessories ( 11 KV Disc with Disc fittings, Pin insulator with pin etc.) as per specification. |
| 103 | Erection of 8.5 mtr Double PCC Pole structure with all accessories (11 KV Disc with Disc fittings, 11 KV Pin insulator with pin etc.) as per specification. |
| 104 | Erection of 11 mtr Double ST Pole DT structure with all accessories (11 Disc with disc Fitting, 11 KV pin insulator with pin etc.) as per specification for intallation of 25/63 KVA Transformer. |
| 105 | Erection of 8.5 mtr Double PCC Pole DT structure with all accessories (Top channel, droper channel , Fuse Set, 11 Disc Fitting, 11 KV pin insulator with pin, T/F MS base Angle etc.) as per specification for intallation of 25/63/100 KVA Transformer. |
| 106 | Erection of 11 KV VCB with earting as per specification. |
| 107 | Grouting of 11 mtr ST Pole With Material as per specification. |
| 108 | Plinth of 11 mtr ST Pole as per specification. |
| 109 | Grouting of 11 mtr PCC Pole With Material as per specification. |
| 110 | Grouting of 8.5 mtr PCC Pole With Material as per specification. |
| 111 | Earthing Complete of 11 Mtr ST Pole as per specification. |
| 112 | Earthing Complete of 11 Mtr PCC Pole as per specification. |
| 113 | Earthing Complete of 8.5 Mtr PCC Pole as per specification. |
| 114 | Laying sagging and binding of of ACSR Weasel Conductor on eracted pole |
| 115 | Laying sagging and binding of of ACSR Dog Conductor on eracted pole |
| 116 | Laying of guarding between erected ST Poles as per specification. |
| 117 | Laying of LT ABC of Size (3x50+1x35+1x16) on erected LT. Pole |
| 118 | Laying of LT ABC of Size (3x95+1x70+1x16) on erected LT. Pole |
| 119 | Laying underground of 11 kv XLPE Cable (3x70) as per specification |
| 120 | Laying underground of 11 kv XLPE Cable (3x120x185) as per specification |
| 121 | Erection of Distribution Box on erected pole as per specification |
| 122 | Installation of 11 KV PPMC in metering room as per specification |
| 123 | Installation of 11 KV CT/PT Unit on PCC/STP Double Pole DT structure as per specification |
| 124 | Installation of 63 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 125 | Installation of 100 KVA Distribution Transformer on erected PCC/STP Double Pole DT structure as per specification |
| 126 | Installation of 250 KVA Distribution Transformer on newly contracted plinth of size 2.0M x 2.0M x 1.5M as per specification |
| 127 | Concreting of stay set as per specification |
| 128 | Intallation of Stay set complete as per specification |
| 129 | Providing and Installation of MS Top Channel of size (125x65x2240mm) on erected double pole. |
| 130 | Providing and Installation of MS Dropper Channel of size (100x50x2028mm) |
| 131 | Providing and Installation of M.S. Cross brassing angle as per specification on erected double pole. |
| 132 | Providing and Installation of T/F MS base Angle of size 75x75x6x2028mm with clamp on erected double pole. |
| 133 | Providing and Installation of 11 KV Fuse set complet in all respect as per specification on erected double pole. |
| 134 | Providing transformer Fencing on 250 KVA and above DT as per specification |
| 135 | Providing and Installation of Eye bolt as per specification. |
| 136 | Providing and Installation of Eye Hook as per specification. |
| 137 | Providing and Installation of Suspension Clamp |
| 138 | Providing and Installation of Dead End Clamp |
| 139 | Providing and Installation of Peircing Connector |
| 140 | Providing and Installation of V-type X-arm holding clamp with nut bolt |
| 141 | Providing and Installation of LT PVC Cable (3.5x70 Sqmm) as Per specification. |
| 142 | Providing and Installation of F bracket on erected PCC/ST Pole |
| 143 | Providing and Installation of Top Channel Clamp |
| 144 | Providing and Installation of T-Off Channel Clamp |
| 145 | Providing and Installation of MS Guarding Angle with clamp |
| 146 | Providing and Installation of MS Guarding Angle |
| 147 | Providing and Installation of 6 SWG GI Wire as per site requirements |
| 148 | Providing and Installation of 8 SWG GI Wire as per site requirements |
| 149 | Providing and Installation of Stay Clamp |
| 150 | Providing and Installation of Droper Angle Clamp |
| 151 | Providing and Erection of Chemical Earthing as Per specification. |
| 152 | Providing 11 KV 3X70 Sqmm XLPE Cable Indoor Type End Termination cable Jointing kit (Danson make/3M make/Raychem make) and making of 11 kv XLPE cable end termination joint as per specifcation. |
| 153 | Providing 11 KV 3X70 Sqmm XLPE Cable outdoor Type End Termination cable Jointing kit (Danson make/3M make/Raychem make) and making of 11 kv XLPE cable end termination joint as per specifcation. |
| 154 | Providing 11 KV 3X120 Sqmm XLPE Cable Indoor Type End Termination cable Jointing kit (Danson make/3M make/Raychem make) and making of 11 kv XLPE cable end termination joint as per specifcation. |
| 155 | Providing 11 KV 3X120 Sqmm XLPE Cable outdoor Type End Termination cable Jointing kit (Danson make/3M make/Raychem make) and making of 11 kv XLPE cable end termination joint as per specifcation. |
| 156 | Providing and Installation of Top/T-off/Droper Chanel Clamp with nut bolts and washer |
| 157 | Providing and Installation of Danger Board on erected PCC/ST Pole |
| 158 | Providing and Installation of Nut & Bolt |
| 159 | Providing and erection of 150mm Dia GI pipe 3 mtr Long. |
| 160 | Tree Branch Cutting/chopping along the HT/LT Line route |
| 161 | Providing and installation ofG.I. Pipe 6 Dia |
| 162 | Providing and installation of GS/GI Earth Wire |
| 163 | Providing and installation of PG Clamp |
| 164 | Providing and paint of Alu. Paint |
| 165 | Providing and paint of Red Oxide Paint |
| 166 | Providing and installation of Stone Pad 300x300x75mm |
| 167 | Providing and installation barbed wire Please Enable Macros to View BoQ information |