| 1 | PARTICULAR |
| 2 | Dismantling of belt structure along with PVC belt (800/1000mm) including cleaning & stacking the same within a distance of 50m. |
| 3 | Transportation of PVC belt (1000mm) from surface to u/g or one section to another sectionin u/g through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part there of including loading, unloading & stacking the same at destination (4870 X 2=9,740.00 Mtr.) |
| 4 | Transportation of steel structures materials from surface to underground or one section to another section through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. |
| 5 | Installation/erection of complete belt conveyor structure (1000mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete. Total Length = 4870.00 mtrs. |
| 6 | Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor. (4870.00X2=9,740.00 Mtr.) |
| 7 | Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/ transporting from other section through haulages/pushing manually. |
| 8 | Shifting of tail end drum of belt conveyor (800/1000 mm with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling, carrying , from one place to other place in same section/district within a lead of 50m. |
| 9 | General cleaning/house keeping not exceeding 5cm in depth including disposal of cleaned muck/debris to be stacked up to 50 m. or to be levelled and neatly dressed at site of drive head installations. 15.00x6.00x 8 nos. = 720.00 Sq.m. |
| 10 | Cutting in soft stone by chisel & hammer for digging of pits of foundation work-a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 8 Set = 32.00m3b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 8 Set = 05.12 m3c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 8 Set = 5.12 m3 Total = 42.24 m3 |
| 11 | Cement concrete/PCC (1:2:4) in foundation/plinth/ flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials)a) for drive head- (4.00x0.50x1) x 02 nos. = 4.00 m3 x 8 Set = 32.00m3b) for discharge - (0.40x0.40x1) x 04 nos. = 0.64 m3 x 8 Set = 05.12 m3c) for Loop Take up- (0.40x0.40x1) x 04 nos. = 0.64 m3 x 8 Set = 5.12 m3 Total = 42.24 m3 |
| 12 | Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m.(a) Sand + Stone Chips (18.80+37.59) |
| 13 | (b) Cement |
| 14 | Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface.(a) Sand + Stone Chips (18.80+37.59) |
| 15 | (b) Cement |
| 16 | Unloading of all kind of building materials from tubs at destination in u/g and stacking the same (a) Sand + Stone Chips (18.80+37.59) |
| 17 | (b) Cement |
| 18 | Dismantling and transporting of 1000mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end. |
| 19 | Installation of 1000 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge. |
| 20 | PART-B:-Material Cost(a) Cement |
| 21 | (b) Sand |
| 22 | (c) Stone Chips Please Enable Macros to View BoQ information |