| 1 | Trenching in ordinary soil up to a depth of 60 cm including removal andstacking of serviceable materials and then disposing of surplus soil, byspreading and neatly levelling within a lead of 50 m and making up thetrenched area to proper levels by filling with earth or earth mixed withsludge or / and manure before and after flooding trench with water(excluding cost of imported earth, sludge or manure). |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m inwidth or 10 sqm on plan), including getting out & dressing of sides andramming of bottoms, lift up to 1.5 m, including getting out the excavatedsoil and disposal of surplus excavated soil as directed, within a lead of50m. All kinds of soil |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. |
| 4 | Providing and laying in position cement concrete of specified grade excludingthe cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand (zone-III) 10 graded stone aggregate 40 mm nominal size (as per direction of officer-in charge.) |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 6 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: 13.61.1 Two or more coats on new work |
| 8 | Manufacturing, supplying and fixing retro reflective sign boards madeup of 2 mm thick aluminium sheet, face to be fully covered with highintensity encapsulated type heat activated retro reflective sheetingconforming to type - IV of ASTM-D 4956-01 in blue and silver white orother colour combination including subject matter, message (bi lingual), symbols and borders etc. as per IRC ; 67:2001, pasted onsubstrate by an adhesive backing which shall be activated by applyingheat and pressure conforming to class -2 of ASTM-D-4956-01 andfixing the same with suitable sized aluminium alloy rivets @ 20 cmc/c to back support frame of M.S. angle iron of size 25x25x3 mmalong with theft resistant measures, mounted and fixed with 2 Nos.M.S. angles of size 35x35x5 mm to a vertical post made up to M.S.Tee section ISMT 50x50x6 mm welded with base plate of size100x100x5 mm at the bottom end and including making holes inpipes, angles flats, providing & fixing M.S. message plate of requiredsize, steel work to be painted with two or more coats of syntheticenamel paint of required shade and of approved brand & manufactureover priming coat of zinc chromate yellow primer (vertical MS-Teesupport to be painted in black/white/grey colours).Backside ofaluminium sheet to be painted with two or more coats of epoxy paintover and including appropriate priming coat including all leads andlifts etc. complete as per drawing , specification and direction ofEngineer-in-charge.16.59.1 Mandatory/ Regulatory sign boards of 900 mm diametrewith support length of 3750 mm |
| 9 | EPDM FLOORING Providing and laying of epdm flooring of 15mm thickness , applying airethane primer over dry cement concrete surface, laying 13mm base layer made of sbr granules 1-4mm , binded together using airethane binder, sealed using sbr black dust binded in airethane sealant. Laying 2mm airethane top coat topped with matt finish coating (EPDM) and marked with line paint (as per direction of officer in charge.) Please Enable Macros to View BoQ information |