| 1 | Item Description/ Heading |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50m and for all lift, as directed by Engineer-incharge. All kinds of soil |
| 4 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. |
| 5 | Brick flat soling |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 7 | Brick work with clamped burnt bricks in foundation below plinth level upto floor V level in all shapes and sizes in: cement mortar 1:6 (1 cement : 6 coarse sand) |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform |
| 12 | Brick work with clamped burnt bricks in foundation below plinth level upto floor V level in all shapes and sizes in: cement mortar 1:6 (1 cement : 6 coarse sand) |
| 13 | 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) |
| 14 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate |
| 15 | Carriage of materials by mechanical transport including loading, unloading and stacking: Earth lead-1.00 km. |
| 16 | Removing and cleaning hard scum and silt form the bottom of the masonry well from 45cm below the ordinary silt level the kerb level dia of well 1.6m to 1.80m. |
| 17 | Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces |
| 18 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work |
| 19 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |