| 1 | Total amount of the \\"Rate Schedule\\" sheet SCHEDULE OF QUANTITY AND RATE FOR SUPPLY AND INSTALLATION OF 990 KVA COMPACT SECONDARY SUBSTATION AT RISHIKESH ROAD NEAR DURGA CHOWK UNDER EDSD, JOLLYGRANT UNDER EDD, DOIWALA AGAINST E-TENDER SPECIFICATION NO.20/EDCRDDUN/2026-27 Name of The Bidder's Firm: 0.0 Sl. No. Description of Work Unit Qty Rate Amount Part [A] (Supply Portion) |
| 2 | SUPPLY OF 11/0.4 KV 990 KVA COMPACT SECONDARY SUB STATION AS PER SPECIFICATIONS 11 KV INCOMMING- 1 NOS 11 KV VCB + 1 NOS RMU LT SIDE OF TRANSFORMER -1600 AMP, 50 KA, 4P ACB-1 NOS LT SIDE OUTGOING - 400 AMP, 36 KA, 4P MCCB- 4 NOS |
| 3 | LT CLAMP FOR ST POLE SP-55 WITH NUT & BOLT |
| 4 | STAY CLAMP FOR SP-55 WITH NUT & BOLT |
| 5 | STAY CLAMP FOR SP-33 WITH NUT & BOLT |
| 6 | SUSPENSION CLAMP |
| 7 | DEAD END CLAMP FOR AB CABLE |
| 8 | AL. TO AL. CONNECTOR FOR AB CABLE 95 TO 95 SQMM. |
| 9 | SHEAR HEAD PIERCING CONNECTOR FOR 120 TO 95 SQMM. |
| 10 | J-HOOK FOR AB CABLE |
| 11 | BOLT & NUTS OFF SIZE |
| 12 | CHEMICAL EARTHING INCLUDING COPPER BONDED EARTHING ROD 3000 MM LENGTH AND 20 MM DIA AND 25 KG 2 NOS CHEMICAL BAG |
| 13 | 57 MM DOUBLE COMPRESSION AL LT GLANDS |
| 14 | G.I. PIPE 6 INCH |
| 15 | LT CABLE BOX FOR ARM CABLE 3.5X240 SQMM. |
| 16 | HT TERMINATION KITS-INDOOR- 3CX300 SQMM 11 KV |
| 17 | HT TERMINATION KITS-OUTDOOR- 3CX300 SQMM 11 KV |
| 18 | LT XLPE ALU ARMOUD CABLE 3.5 X 240 SQMM. |
| 19 | 11 KV XLPE CABLE ALU 3 X 300 SQMM. |
| 20 | LT DISTRIBUTION BOX 3 PHASE |
| 21 | AL. CRIMPING TYPE LUGS 70 SQMM. Total - Part [A] 0.0 Part [B] (Labour Portion) |
| 22 | FIXING OF GI PIPE |
| 23 | EXCAVATION OF EARTH FOR POLE PIT OF SIZE 0.9X0.6X1/6 OF FULL LENGTH OF POLE FOR ERECTION OF POLE IN ALL TYPE OF SOIL INCLUDING PROPER DRESSING OF SIDES AND RAMMING OF BOTTOM INCLUDING GETTING OUT THE EXCAVATED SOIL AND DISPOSAL OF SURPLUS EXCAVATED SOIL AS PER DIRECTED COMPLETE WORK |
| 24 | ERECTION OF FOLLOWING DOUBLE SUPPORT POLE IN PROPER LEVEL AND ALIGNMENT ALONGWITH FIXING OF ALL ACCESSORIES, LIKE TOP CHANNEL, X-BRACING & CLAMPS AS PER RESPO CONSTRUCTION MANUAL. ST POLE SP-33 Nos 1.0 0.0 |
| 25 | GROUTING OF POLE IN SIZE 0.45X0.45X1/9 OF SUPPORT IN CC RATIO 1:4:8 (1 CEMENT : 4 GRADED STONE 20MM NOMINAL SIZE : 8 COARSE SAND) BLOCK INCLUDING COST OF CEMENT SAND AND STONE BLAST BACK FILLING OF SOIL AND BOULDER IN PIT AND RAMMING AND PROPER ALIGNMENT, LEVELING AS PER RESPO CONSTRUCTION MANUAL. |
| 26 | MUFFING OF POLES SIZE 0.45 CM X 0.60 CM RADIUS WITH CC 1:3:6 (1 CEMENT : 3 COARSE SAND : 6 GRADED STONE 10 MM NOMINAL SIZE) BLOCK SIZE 45 CM HEIGHT FROM GROUND LEVEL INCLUDING COST OF CEMENT, STONE AND SAND ETC. |
| 27 | DISMANTLING OF SP-55 SINGLE POLE |
| 28 | DISMANTLING OF 250 KVA DTR |
| 29 | MOUNTING & FIXING OF FUSE SETS ON DOUBLE POLE STRUCTURES INCLUDING MAKING OF CONNECTIONS COMPLETE WORK |
| 30 | T-OFF CONNECTION COMPLETE 11 KV LINE |
| 31 | FIXING OF 11 KV XLPE JOINTING KIT |
| 32 | FABRICATION OF M.S. CHANNEL ANGLE IRON AFTER CUTTING IN REQUIRED SIZES WITH DRILLING OF HOLES UPTO GOOD FINISH FOR TOP CHANNEL, BRACING AND SPECIAL TYPE BRACKET ETC. AS PER RESPO SCHEDULE AND LOCAL APPROVED DRAWING. |
| 33 | LAYING & FIXING OF LT XLPE CABLE |
| 34 | FIXING OF SUSPENSION CLAMP WITH I HOOK |
| 35 | PROVIDING AND FIXING OF FENCING FOR CSS |
| 36 | JUMPERING AND CONNECTION COMPLETE ON THE D/P CONDUCTOR TO TPMO FUSE SET & T/F |
| 37 | ERECTION OF DEAD END CLAMP |
| 38 | ERECTION & LAYING OF 11 KV CABLE 3X300 SQMM. |
| 39 | ERECTION & LAYING OF LT ARM CABLE 3.5X240 SQMM. |
| 40 | INSTALLATION OF 300 SQMM. LT GLANDS |
| 41 | ERECTION OF LT CABLE BOX FOR 3.5X240 SQMM. |
| 42 | LAYING & ERECTION & COMM. OF LT AB CABLE 3X120+95 SQMM. WITH ACCESSORIES |
| 43 | BACK FILLING PIT BY EARTH SOIL & STONE |
| 44 | FIXING OF LT SPECIAL CLAMP |
| 45 | CHEMICAL EARTHING : EARTHING OF DISTRIBUTION TRANSFORMER INCLUDING DIGGING OF PIT OF SIZE 2.5 MTR. DEPTH AND MAKE HOLE OF SIZE 150 MM. PLACING OF EARTHING ELECTRODE (TO BE SUPPLIED BY CONTRACTOR AS PER DRAWING NO. A) AS DRAWING B, CONNECTING THE SAME WITH G.I. STRIP (TO BE SUPPLIED BY CONTRACTOR) OF SIZE 35X6 MM. AS PER DRAWING C FOR A MINIMUM LENGTH 6 M. TREATMENT OF SOIL WITH HIGHLY CONDUCTIVE SUBSTANCE AS PER IS 30343 COMPLETE IN ALL RESPECT, RESULT OF EARTHING RESISTANCE TO BE RECORDED IN M.B. BEFORE AND AFTER INSTALLATION OF EARTHING. THE EARTH RESISTANCE AFTER EARTHING SHOULD BE LESS THAN 1 OHM. |
| 46 | CONSTRUCTION OF SP RCC PLINTH FOR EXTRA STRENGHTENING |
| 47 | HI-POT TEST 11 KV CABLE & BUS BAR OF CSS |
| 48 | HI-POT TEST LT CABLE & BUS BAR OF CSS |
| 49 | ERECTION OF POLE CLAMP FOR LT CABLE ON POLE |
| 50 | ERECTION OF 11/0.4 KV 990 KV COMPACT SECONDARY SUBSTATION |
| 51 | BACK CARRIAGE OF SCRAP MATERIAL Total - Part [B] 0.0 TOTAL [Part-(A) + Part (B)] 0.0 Place Date Superintending Engineer Please Enable Macros to View BoQ information |