|
| 1 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood trees and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.Including supply of all material, labour, T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 3 | Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge. Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 4 | Removal of debris / waste material / rubbish on road side / dismantaled refuses/ park / dust bin and from any other location by full load tractor trolly (150 Cubic Foot) within the specified colonies as desired by the Engineer-in-charge & safe disposal of the same out side the colony area including cost of all labour T& P, for removal of slip/landslide/excavation in dry and wet condition etc required for proper loading/unloading and disposal of waste or any other material required for the proper completiom of work.Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 5 | Engaging & operation of one no.Hydraulic excavator cum loader machine (preferably JCB)having capacity 75 BHP with one operator and one helper, including cost of fule lubricants and repair maintenance etc. for removal of slip/landslide/excavation in dry and wet condition, complete in all respect as per direction of I/C.Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 6 | Dewatering of water caused due to seepage of ground water and surface water due to rain etc. excluding excavation of foundation but during execution of civil works including supply of all machine operator,khalashi,POL,T&P, accessories required for proper completion of the work.Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 7 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. GI wire 10 gauge BWG. Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 8 | Stone masonry in cement mortar for substructure complete as per drawing & technical.Random rubble masonry in 1:6 cement mortar. Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : \\"1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size). Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size).Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 11 | Supply Beldar/mazdoor/Sweeper/ (unskilled) for full day as per requirement for attending miscellaneous works as per direction of the Engineer In Charge for proper completion of the work with T&P as required. |
| 12 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge.Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 13 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical .Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 14 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.Including supply of all material, labour, T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 15 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form work for.Foundations, footings, bases for columns.Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 17 | Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work. Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 18 | Construction of toe walls for protection of slopes as per drawing and technical specifications. Random rubble masonry in case of stone pitching laid with cement mortar (1:5).Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 19 | Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes and water jet pressure etc. and disposal of debris. 50mm average thickness.Including supply of all material, labour, T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 20 | Eproxy bonding of new concrete to old concrete. Including supply of all material, labour, T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 21 | Micro Alloyed Cement concrete (M-40 and above grade) work for Repair of R.C.C. Work Stair's and old structure. including labour T&P etc for proper completion of work. Including supply of all material, labour,T&P etc required for proper completion of the work as per direction of Engineer-in -Charge. |
| 22 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)Dismantling Stone Masonry By Manual Means. Rubble stone masonry in cement mortar. Please Enable Macros to View BoQ information |