|
| 1 | JHARKHAND URJA SANCHARAN NIGAM LIMITED Tender Inviting Authority :- General Manager, Transmission Zone-VI, Deoghar Price Part-II e-NIT No. 141/PR/JUSNL/2026-27 Name of Work Annual maintenance work of 132/33 kV Grid Sub Station, Kundhit for the period from 01.06.2026 to 31.03.2027 (i.e. 10 months) for F.Y. 2026-27. Name of the Bidder S/N Description Unit Qty Months Qty. Unit Rate Amount |
| 2 | Supply of Manpower for Preventative / Routine Maintenance of Grid Substation as per schedule provided by Engineer in-charge: - a Skilled ( Electrician / Technician) Mandays 2.0 10.0 20.0 18075.05 361501.0 b Un-skilled Helper Mandays 2.0 10.0 20.0 13088.1 261762.0 |
| 3 | Supply of Manpower for regular cleaning/ sweeping of Control Room building, bathrooms, Offices, Stores, Battery Room, approach road and surrounding areas etc as per direction of Engineer in-charge a Un-skilled Labour Mandays 1.0 10.0 10.0 13088.1 130881.0 |
| 4 | Break down/Shutdown Maintenance of Grid Sub-station :- a supply of Emergency Gang with T&P for work like Conductor snapping of main bus etc. Per gang 1.0 - 1.0 30286.81 30286.81 30286.81 |
| 5 | Erection, Connection, Testing and commissioning of following equipments with Crane/derrick at site including handling the material/equipments carefully at site including labour charges for all incidental and operational items of work (Excluding Cost of Transportation Charges from Store to Site.) i Erection, testing and commissioning of 33KV CT or PT Nos. 2.0 - 2.0 2476.86 4953.72 2476.86 ii Erection, testing and commissioning of 33KV LA Nos. 2.0 - 2.0 1415.52 2831.04 1415.52 iii Erection of 33 KV Vacuum Circuit Breaker including Cable Termination Nos. 1.0 - 1.0 16511.62 16511.62 16511.62 iv Erection of 132 KV CT or PT or CVT including cable termination Nos. 2.0 - 2.0 7549.0 15098.0 7549.0 v Erection of 132 KV LA including cable termination Nos. 2.0 - 2.0 3302.08 6604.16 3302.08 |
| 6 | Dismantling of following equipments with Crane/derrick at site including handling the material/equipments carefully at site including labour charges for all incidental and operational items of work (Excluding Cost of Transportation Charges from Store to Site.) i Dismantling of 33KV CT or PT Nos. 2.0 - 2.0 1040.2812 2080.56 1040.2812 ii Dismantling of 33KV LA Nos. 2.0 - 2.0 594.5183999999999 1189.04 594.5183999999999 iii Dismantling of 33 KV Vacuum Circuit Breaker including Cable Termination Nos. 1.0 - 1.0 6934.880399999999 6934.88 6934.880399999999 iv Dismantling of 132 KV CT or PT. Nos. 2.0 - 2.0 3170.5799999999995 6341.16 3170.5799999999995 v Dismantling of 132 KV LA Nos. 2.0 - 2.0 1386.8735999999997 2773.75 1386.8735999999997 |
| 7 | Supply of Hydra / Crane (upto 08 MT capacity) as per requirement. Add. Hrs. 4.0 - 4.0 1160.0 4640.0 1160.0 |
| 8 | Engagement of Hydraulic Excavator (JCB) as per requirement & direction of E/I |
| 9 | Complete Overhauling of Cooling Fans of 50 MVA/ 20 MVA Power Transformer with supply of all materials if required any. |
| 10 | Transportation of Transformer accessories/ fittings, other GSS equipment, through Truck / Pickup from Transmission central Store Deoghar & Other GSS/Sites to GSS Kundhit including loading, unloading of the equipment/materials in proper packing (before loading) & (after loading) Upto 3 MT (i) Upto First 50 kM Trip 2.0 - 2.0 4992.0 9984.0 4992.0 (ii) 50 kM < Distance < 500 kM (Rate per km) Km 100.0 - 100.0 27.0 2700.0 27.0 |
| 11 | Repair and Overhauling of 3 Ph Sub-Mersible pump set including cost of materials, lifting & lay down of Sub-mersible pump from Borewell, repair of water supply pipe all complete job and Transportation cost. |
| 12 | Testing Transformer oil by recognized laboratory including supply of sampling bottle. (These tests are mandatory and must be completed by the end of December, 2026) :- (i) BDV Nos. 2.0 - 2.0 1420.0 2840.0 1420.0 (ii) DGA Nos. 2.0 - 2.0 6930.0 13860.0 6930.0 (iii) Water content PPM Nos. 2.0 - 2.0 1740.0 3480.0 1740.0 (iv) Contingency (Including Sampling Bottle, DD Cost To & Fro Charges with fooding & lodging) Nos. 1.0 - 1.0 3559.5 3559.5 3559.5 |
| 13 | Supply of Consumables viz. Markin cloth, Cotton waste, Joute, Distilled water, Brush, HT Nuts & Bolts, Patrollium Jelly, Grease, Kerosine, Petrol, Mobil, WD-40 rust remover,… etc whatever required time to time for O&M work of G/S/S. |
| 14 | Maintenance of 100KVA DG Set (replacement of Air & fuel filter, Gasket valve cover, engine tube oil etc.) |
| 15 | Provision of Diesel fuel for 100 KVA DG set for running of DG set. |
| 16 | Air Condition Annual Maintenance charge with all spares at 132/33kV GSS Kundhit by manufactured service engineer a Gas Filling Charge Nos. 4.0 - 4.0 4000.0 16000.0 4000.0 b Annual Maintenance with all spares Nos. 12.0 - 12.0 8000.0 96000.0 8000.0 |
| 17 | Assessment of defects in Battery chargers and minor repairing Sub-Total (A) for Sl. No.- 1, 2 & 3 754144.0 Approximate increase in VDA during a year @10% on Sub Total (A) 75414.40000000001 Sub-Total (B) 829558.4 Sub-Total (C) for Sl. No. 3 to 16 394471.94 For S.N. 03 to 16, rate to be quoted by bidder in % (percentage) Select Criteria from below Put Rate in case of above or below Select any one from criteria : above/ below/estimated cost. Estimated Cost 0.0 Overhead Expenditure for T&P etc. @ 03% on Sub-Total (B) 24886.75 Contractor Profit on Total (B) @(To be quoted by bidder in digit only upto two decimal places only)(Note-Maximum 10% and not Below than 0%) 0.0 0.0 EPF Contribution of Employer@12% on Sub Total (B) 99547.01 ESIC Contribution of Employer @ 3.25% on Sub Total (B) 26960.65 Administrative Charges @ 0.5% on Sub Total (B) 4147.79 EDLI (@ 0.5% of wages for the wages below than Rs. 15000/- and maximum to Rs. 75/- for the wages above than Rs. 15000/- per manpower per month) on Sl. No.- 1, 2 & 3 3659.54 Sub Total (D) 1383232.08 CGST @ 9% on Sub-Total (D) 124490.89 SGST @ 9% on Sub-Total (D) 124490.89 Total 1632213.8599999999 Labour Cess @ 1% 16322.14 Gross Total 1648535.9999999998 Say 1648536.0 Amount in words Note: Bidder will fill their name and quote percentage in given format. |