| 1 | Renovation lawn including weeding and cheeling the grass forking the ground top dressing with sludge of manure, mixing the same with forked soil watering and maintaining the lawn for 30 days of more till the grass from a thick lawn free from weeds and fit or mowing and disposal of rubbish as directed, including supplying good earth if needed but excluding the cost of sludge of manure (the good earth sahll be paid for separately) |
| 2 | Digging of holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%:1 part of stacked volume of manure after reduction by 8%) flooding with water dressing including removal of rubbish and surplus earth if any with all leads and lifts cost of manure sludge of extra good earth if needed to be paid for separately pit size. |
| 3 | Trees 0.90 mtr. dia & 0.90mtr deep |
| 4 | Shrubs 0.60 mtr. dia & 0.60mtr deep |
| 5 | Supply & Planting of plants as required by engineer incharge in 8' X 12'.size polythene bags or erthen pots well branched and fully foliage branching dia 0.50 to 0.75mtr., free from disease at site i/c stacking with bamboos and binding with sutli (not below than 6'-8' common varieties) (As per market rate) (Neem, Amaltas, Jamun, Pilkhan, Papdi, Arjun, Cassia Semia etc.) |
| 6 | Trees |
| 7 | Supply & planting of shrubs, plants height 2-2.5 feet as required by engineering in charge in 6' x 8' polythene bags or earthen pot fully foliage and well branched free from disease. |
| 8 | Shrubs (Kaner, ticoma, Hamelia) |
| 9 | Complete maintenance of trees on road side plantation (RSP) (out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other which shall be supplied by the department and other T& P material / articles shall be provided by the contractor) and as per direction of officer in charge |
| 10 | Trees (upto 4 & upto 3 years slow & fast growing group) (respectively)249.00X24 = 5976.00 Months |
| 11 | Trees (upto 4 & upto 3 years slow & fast growing group) (respectively)50.00X24 = 1200.00 Months |
| 12 | Trees (upto 4 & upto 3 years slow & fast growing group) (respectively)1741.00X12 = 20892.00 Months |
| 13 | Providing and watering for irrigation through water tanker of Horticulture features i.e. lawn, tree, shrubs, hedge/edge, ground cover etc. at the side of work water tanker having 5000 ltr. Capacity with one labour for watering / I/C cost of water, filling of tanker, watering at side with all leads and lifts las per direction of officer in charge |
| 14 | Trees (upto 4 & upto 3 year slow & fast growing group. (respectively)249.00X12 = 2988.00 Months |
| 15 | Trees (upto 4 & upto 3 year slow & fast growing group. (respectively)50.00X10 =500.00 Months |
| 16 | Trees/ (4-8 & 5-6 year slow & fast Growing group) (respectively)1741.00X12 = 20892.00 Months |
| 17 | watering of 1 to 3 years plants (for shrubs)4619.00X10 = 46190 Months |
| 18 | Complete maintenance of shrubs on RSP (out side garden features) (jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T & P material / articles shall be provided by the contractor) and as per direction of officer in charge4619.00X10 = 46190 Months |
| 19 | Complete maintenance of the entire Garden featured having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, ledge, flower, beds foliage creeper etc. including hoeing wedding, pruning, replacement of paints gap filing, mowing of lawn, grass cutting by lawn moved and brush cutter, removal of garden waste, applying in secticide, pesticide & fertilizer, (Whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as per directed by officer in charge, (cost of good eawrth, manure, fertilizer, insecticide, pesticide will be provided by constractor) and as per direction officers in charge.57629.28X12 = 691551.36 Months |
| 20 | Providing Profuse watering arrangement for lawn/park at site to make available for irrigation RH pipe/canvas pipe & other T& P etc. In the process of watering with arrangements of submersible pump and accessories as per direction of officers in charge of work.SOR2020.14.24X12 = 170.88 Months |
| 21 | D/I/T/C tube well boring of 150mm dia including all material & Labour complete PVC boring pipe and stainer of make Finolex / Kisan/Supreme approved by engineering in charg eof boring 200 feet. |
| 22 | S/F Submersible motor pump CRI make of 3 HP fixing and all material and labour complete. |
| 23 | Excavation & back filling the trench for PVC Pipe line with all labour T&P etc. complete. (size 1.00x 0.45x0.9) as per UP PWD SOR rate. |
| 24 | P/F following size of Finolex makes PVC, pipes 6.0 kg/cm2 with required PVC Standard special confirming to IS codes with latest amendment and lowering the same tranches and laying true to alignment and gradient complete i/e the cost of cutting of pipes for making up to length and making joints i/c cost of socket. Pisiochem PV-85 pvr solvent cement complete PVC pipe must the confirming to IS: 4985-2000 with latest amendment, Make-Finolex/Kisan/supreme Industries Ltd. (Rate as per comparative statement per Rm.) |
| 25 | 90mm dia with coupler @6kgf/ Cm2 pressure with i/e all PVC Standard specials |
| 26 | Providing and fixing hydrant with all complete. |
| 27 | Clearing of Jungle including uprooting of weeds ran vegetation grass brush wood trees and sapling of girth up to 30cm measured at height of 1.00mtr. Above ground level removal of rubbish up to a distance of 50mtr. Out side the periphery of the area cleared (As per UP PWD SOR item No. 259 (i) (Area Should be clean each and everypoint of time)87445.00X = 349780.00 Time a Years |
| 28 | Supply of Neem oil cake pulverized and un-decordicated packed in bags. |
| 29 | Supply of Steamed bone meal at site packed in bags. |
| 30 | Supplying and stacking of well decayed cattle manure site including royalty and carriage up to 5 km. lead complete (Cattle manure measured in stacks will reduced by 8% for payment) |
| 31 | Supply of chlorpyriphos 20% E.C./Lindane 20% E.C for anti termite treatment of plants @ 2ml./plant and in the interval 1 month up to one year i.e.12 times in a year hence it comes 0.024 Itr. / plant (As) per market rate) |
| 32 | Pruning, trimming, shaping of trees/shrubs (ht. 15 feet and above) 1/c removal of cut materials upto 50mtr. lead and as per direction of office in charge (Necessary T&P shall be arranged by the contractor) |
| 33 | Supply of labour for prunning and horticulture waste work. |
| 34 | Supply of tractor trolly with driver for horticulture waste work. |
| 35 | Supply of 360 Degree Rotating automatic garden plastic sprinkler with metal stand (G.I Pipe) 2Wheel Dimension (L X W X H) 50.8 X 48.26 X 73.66cm weight 850gm. The sprinkler shall be capable of both non recresing full circle and part circle opration in the same unit. Manual rotation in any direction the sprinkler shall automatically return the water stream to its preset arc. The adjustment can be perform on both the right and left trip of the sprinkler. |
| 36 | Supply of M.S. Circular tree Gurard 450mm internal dia framed with 03 Nos. vertical M.S angle 25x25x3mm with over all length 2100mm having 03 nos of rings of M.S. flat 25x3mm with welded wire mesh 1400mm height made of 75x75x2.5 mm size logo plate size 200x100mm fo M.S. sheet of 16 gaze painted with primer and green enamel paint (All cost inclusive & as per drawing) colour of name Plate yellow & Mehroon with logo of GNIDA (ARGNIDA) |
| 37 | CIVIL WORK |
| 38 | Demolishing cement concrete manually/ by mechanical means including disposal of material with in 50m lead as per direction of Engineer-in-charge. |
| 39 | Nominal concrete 1:3:6 or richer mix (including equivaent design mix SOR-18/15.2.1) |
| 40 | Supply and Fixing of R.C.C. Grill work 9(JALI) of approved pattern & make at site of work in cement concrete consisting of cement, approved coarse sand and 6 mm. nominal size stone grit in the proportion of 1:2:4 & reinforced with 6 mm. dia M.S. wire/bar including cutting & finishing with 1:3 cement and & fine sand of 1.25 fineness modules mortar including including supply of all materials, Labour, Tools & Plants etc, required for proper completion of the work but excluding plaster on jambs, still & soffit of the opening. (5.00 Cm thick) |
| 41 | M-150 brick work in 1:4 one cement or four coarse sand 2.20 F.M mortar in foundation and plinth including supply of all material, Labour, T&P etc. |
| 42 | UPPWD/SOR-2020/305(a) |
| 43 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement All work up to plinth level: |
| 44 | 1:2:4 (1 cement: 2 coarse sand 4 graded stone aggregate 20 mm nominal size) |
| 45 | UPPWD/SOR-2020/279(a) |
| 46 | 40mm thick fine dressed stone flooring over 20mm (average) thick base of cement mortar 1:5 (cement 5 coarse sand) with joints finished flush. |
| 47 | Red sand stone |
| 48 | DAR-20/11.28/P--763 |
| 49 | 12 mm cement plaster of mix: |
| 50 | 1:4 (1 cement: 4 coarse sand) |
| 51 | DSR-18/13.4.1/AR |
| 52 | Finishing wall with water proof cement paint of approved make and quality on new wood with two coat to give an even shade including supply of all Materials, Labour, Tools & Plants etc, required for proper completion of the work. |
| 53 | SOR-20, 660 |
| 54 | Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one Sq Metre) Paint (British antesol or equivalent including supply of all Materials, Labour, Tools & Plants etc, required for proper completion of the work, Paint to be used should conform the ISI |
| 55 | SOR-2020, 644, 15.04 |
| 56 | For Pathway |
| 57 | Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA |
| 58 | All kind of soil.SOR-2018 |
| 59 | For pathway |
| 60 | Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281) |
| 61 | For pathway |
| 62 | M-150 Brick work in 1:4 cement & coarsesand 2.20 FM Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 3059 (a) |
| 63 | For pathway |
| 64 | 12mm cement plaster of mix |
| 65 | 1:6 (1cement: 6 coarse sand) |
| 66 | DAR-18/13.4.2 |
| 67 | For pathway |
| 68 | 40mm thick fine dressed stone flooring over 20mm (average) thick base of cement mortar 1:5 (cement : 5 coarse sand) with joints finished flush. |
| 69 | Excavating holes up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. disposing within a lead of 50m and lift upto 1.5m. |
| 70 | Depth from 0.0 to 1.5m below |
| 71 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: |
| 72 | 1:3:6 (1 cement: 3 coarse sand: 6 graded stone) |
| 73 | SOR-281 |
| 74 | Supply at site R.C.C Standards post/struts/rails/pales of mix 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 12.5 m m nominal size) with wooden plugs or mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). |
| 75 | DSR-2013/16.15.1/P- |
| 76 | Fencing with R.C.C Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but end post and corner post shall be strutted on both sides and end post one side only provided with norizontal lines and two diagonals of barbed wire 9.35 Kg. per 100 meters (min) between the two posts fitted and fixed with G.I. staples on wooden plugs or G.l binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C Posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used. |
| 77 | With G.I. barbed wire |
| 78 | DSR-2018/16.18.1 |
| 79 | White Washing with lime to give and even shade |
| 80 | New work (three or more coat) |
| 81 | SOR-2020-P-671 |
| 82 | Earth work in ordinary soil in all of foundation trenches including dressing of the side and ramming of bottom lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m AR/GNIDA |
| 83 | All kind of soil SOR-2018 |
| 84 | Cement concrete with 4 cm gauge approved stone ballast, Coarsesand & cement concrete in the protection of 8:4:1 including supply of all materials labour, Tools & plants etc. required for proper completion of the work. (As per item SOR no-281) |
| 85 | M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 3059 (a) |
| 86 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15\\" landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement 2 coarse sand: 4 graded stone aggregate 20 mm nominal size). |
| 87 | DSR-18/5.3/P-96 |
| 88 | Steel reinforcement for R.C.C work including staightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 89 | Thermo-Mechanically Treated bars |
| 90 | DAR-18/5.22.6 |
| 91 | As an item 360 above but 2.5 cm thick and of cement concrete consisting of 1 part cement 1 ½ part approved coarse sand and 3 parts approved 10 mm. graded stone gnt and including water proofing, as ordered by the Engineer incharge in the proportion as specified by the manufacture. |
| 92 | SOR-2020/360, 361 |
| 93 | 6 mm cement plater of mix: |
| 94 | 1:3 (1 cement: 3 fine sand) |
| 95 | Finishing walls with water proofing cemtn paint New work (Two or more Coats) Item Code: 13:44.1 |
| 96 | Supply and stacking of good earth at site including royalty and carriage upto 5km lead complete (Earth measured in stacks will be reduced 20% for payment Based on PWD SOR. |
| 97 | Labour Cess and GST will be paid extra as per govt. orders Please Enable Macros to View BoQ information |