| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.The Contractor has to dectect different utilities like sewer line, water supply line, electric cable, telephone cable , gas pipe line etc, using utility decteting machine before start of excavation and shall start excavation only after getting permission of E/I. All kind of soil |
| 2 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 5 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 100 in foundations and plinth in Cement mortar 1:3 (1 cement : 3 coarse sand) |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 7 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) |
| 8 | Neat cement punning |
| 9 | Earth work in embankment in ordinary soil embankment to be in 20cm layers including ramming, dressing the surface to required levels with half tonne steel or wooden rammer and rolling every third and top most layer in roller 8 to 10 tonne capacity and including 1.50mtr. lift and all lead (earth shall be brought from a place which including cartage of earth by mechnically transport and T&P, labour etc. required for proper completion. (earth shall be arranged by the contractor at his own cost.) |
| 10 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 11 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) |
| 12 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, brooming with wire brush etc. complete as per specifications and directions of Engineer-incharge. (The panel shuttering work shall be paid for separately). (Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). |
| 13 | P/F plane A.C. Sheet strip injoints pavements/terrazo flooring 100 mm & 6mm thick. |
| 14 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete Please Enable Macros to View BoQ information |