| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m. All kinds of soil. (DSR-2018/2.28.1/P-75) |
| 2 | Cleaning jungle including up rooting of rank, vegitations grass, push, wood trees and samplings of grith upto 30 cms. Measured at a height of 1 M. above ground level and removal of rubbish up to a distance of 50 M. out side the periphery of area cleared. (SOR-20/4.06/259(i))Same as above 259(i) above but grass only.(SOR-20/4.06/259(a)) |
| 3 | Tractor with trolley including POL and driver. (SOR-20/Ch-2/SI. No. 19) |
| 4 | Supply of labour.(SOR-20/Ch-2/SI. No. 12) |
| 5 | Excavation in foundation in ordinary soil (Lorm,Clay or sand ) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removel and disposal of surplus earth as directed by the engineer incharge upto distance of 30 M.from the foundation trenchess.( where machine con not reach / move ).(SOR-20/4.01/251(a)) |
| 6 | Extra rates for quantities of works, executed: In or under water and/or liquid mud, including pumping out water as required.(DSR-18/2.24.1/AR) |
| 7 | Cartage of earth or fly ash when added to schedule item no. 253 : 1st Km. (If lead is beyond 1/2 Km.).(SOR-20/4.08/261(b)) |
| 8 | Providing and fixing SFRC Cover over chamber. (without frame) 50mm thick.Size: 600x600mm (Heavy duty) |
| 9 | M-150 Brick Work in 1:6 cement & fine sand 1.25 F.M. mortar in foundation and plinth including supply of all materials, labour and T&P etc. requried for proper completion of the work. Same as item no. 303 but in 1:4 one cement & 4 fine sand of 1.25 F.M. mortar. (SOR-20/6.05/305)Same as item no. 305 but in 1:4 one cement & four Coarse sand of 2.20 F.M. mortar.(SOR-20/6.05/305(a)) |
| 10 | 12mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand).(DSR-18/13.4.2/AR) |
| 11 | Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil.DSR-18/2.30.1/AR |
| 12 | Supply at Site: R.C.C standards post/ struts/rails/pales of mix 1:1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 12 mm nominal size) with wooden plugs of 6 mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth workes in excavation concrete works in foundation to be paid separately).DSR-2018/16.15.1/AR |
| 13 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/5.08/281) |
| 14 | Painting or varnishing with valsper or other approved high grade enamel or super par synthetic clean varnish complete one coat over previously painted surface including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. paint to be used should confirm ISI no. 105/106/133-1950 (SOR-20/15.07/647) |
| 15 | Tractor with water tanker with cost of water including P.O.L.(SOR-20/Ch-2/SI. No. 27) |
| 16 | Providing JCB with driver and including POL (SOR-20/Ch-2/SI. No. 31) |
| 17 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. (Length of finished kerb edging shall be measured for payment). (Old kerb stones shall be supplied by the department free of cost). (DSR-2018/16.85/AR) |
| 18 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). (DSR-2018/16.69/AR) |
| 19 | White washing with lime to give an even shape: Old work (One or more coats).DSR-18/14.42.2/AR |
| 20 | Painting with aluminium paint of approved brand and manufacture to give an even shade: One or more coats on old work.DSR-18/13.100.1/AR |
| 21 | Plain/Reinforceed cement concrete in open foundation complete as per drawing and technical specifiations.RCC Grade M25 using batching plant transit mixture and manual placing. MoRTH-20/9.06/E/Case-II |
| 22 | Steel Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo mechanically treated barsof grade Fe-500D or more. (DSR-18/5.22.6/AR) |
| 23 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/5.08/281) |
| 24 | Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.Same as above item no. 279 but with 2 cm. gauge stone grit instead of 4 cm. gauge stone ballast. (SOR-20/5.07/279(a)) |
| 25 | Fencing with R.C.C post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire.DSR-18/16.17.1/AR |
| 26 | Providing and fixing at or near ground level factory made RCC pavement slab of M-30 grade of size 450x450x50mm, including reinforcement with 6 mm dia M.S. bars 4 nos on each side, including setting in position in footpath to the required level and line over a bed of 20 mm average thick cement mortar 1:5 (1 cement : 5 coarse sand).AR/GNIDA |
| 27 | Excavation in foundation in ordinary soil (Lorm,Clay or sand ) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removel and disposal of surplus earth as directed by the engineer incharge upto distance of 30 M.from the foundation trenchess.( where machine con not reach / move ).(SOR-20/4.01/251(a)) |
| 28 | Supply of ISI marked RCC NP-2 pipe of following sizes including carting loading, unloading at near including all taxes and laives & rubber rings. |
| 29 | 450 mm dia RCC pipe |
| 30 | 600 mm dia RCC pipe |
| 31 | Laying NP-2 RCC S&S pipes jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete. |
| 32 | 450 mm dia RCC pipe |
| 33 | 600 mm dia RCC pipe |
| 34 | Providing and laying in position cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) in concrete cradle under NP-2 pipe of following diameter including centring shuttering but excluding excavation as per approved. |
| 35 | 450 mm dia RCC pipe |
| 36 | 600 mm dia RCC pipe |
| 37 | Labour Cess will be paid extra as per applicable |
| 38 | GST will be paid extra as per applicable Please Enable Macros to View BoQ information |