| 1 | Excavation in foundation in ordinary soil (Loam clay or sand) including lift upto 1.50 M and lead upto 30.00M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer incharge upto a distance of 30m from the foundation trenches (where machine con not reach/move) (SOR-20/251 (A)/4.1.1) |
| 2 | Cartage of ballast, Kankar Coal, grit or sand including loading & unloading but excluding stackings on pakka roads. (SOR-20/231) |
| 3 | As in item (231) above but for cement steel or other materials. Lead upto 2Km (SOR-20/232(a)) |
| 4 | Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. (DSR-18/16.1) |
| 5 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks.(DSR-18/11.2) |
| 6 | Cement concrete with 4cm gaugeApproved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & Plants etc required for proper completion of the work |
| 7 | 8:4:1 (1 Cement 4: Coarse sand :8 graded stone aggregate 40mm nominal size) (SOR-20/281/5.08) |
| 8 | Providing and laying 80mm thick ISI mark Factory made cement concrete interlocking Paver block made by block making machine with strong vibratory compaction of approved size, Zig Zag shape, laid in grey colour of M-40 and pattern over and including average 50mm compacted bed and fine sand and filling the joints with fine sand all complete as per direction of engineer-in-charge with GNIDA/A.R. |
| 9 | Granular sub-base with graded material, plant mix method Construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. MORTH/4.01/401(A) |
| 10 | Providing and fixing at or near ground level factory made RCC pavement slab of M-30 grade of size 450x450x70 mm, including reinforcement with 6 mm dia M.S. bars 4 nos on each side, including setting in position in footpath to the required level and line over a bed of 20 mm average thick cement mortar 1:3 (1 cement : 3 coarse sand), having joint thickness not more than 5mm except on curve, including filling of joints with same cement mortar and making grooves etc. complete as per direction of Engineer-in-charge. (AR/GNIDA) |
| 11 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR-20/279)Same as above item no 279 but with 2cm gauge stone grit instead of 4cm gauge stone ballast. (SOR-20/279(a) |
| 12 | Labour cess and GST will be paid extra as per Govt. orders. Please Enable Macros to View BoQ information |