Tender For Repair And Maintenance Of Pqc Slabs And Connected Items Incld Links And Dispersals Of Air Field Under Ge (Af) Tech Area At Af Station Agra, Agra-Uttar Pradesh
TDR : 55425308
Tender Notice
BOQ
16 Days Left
Agra
Uttar Pradesh
Tender For Repair And Maintenance Of Pqc Slabs And Connected Items Incld Links And Dispersals Of Air Field Under Ge (Af) Tech Area At Af Station Agra
Name of Work:- REPAIR AND MAINT OF PQC SLABS AND CONNECTED ITEMS INCLD LINKS AND DISPERSALS OF AIR FIELD UNDER GE (AF) TECH AREA AT AF STATION AGRA
Sl. No.
Item Description
1
Repair to existing surface pavement by cutting inverted trapezoidal section in regular shapes by diamond cutters and chiselling, removing loose concrete, cleaning with compressed air & washing with chemical water solution, priming epoxy resin primer at the rate of 0.34 Kg/Sqm applied by sprayer or brush and making good with epoxy mortar including disposal of rubbish to distance 250 m but not exceeding 500 m complete all as specified & directed.Note:- The washing agent shall be 15% diluted hydrochloride, epoxy resin primer of NITOPRIME 25 brand of M/s FOSROCK industries and epoxy mortar shall be NITOMORTORS brand of M/s FOSROCK industries or equivalent as approved by GE.
2
Demolition of un-reinforced cement concrete of any description and in any position not otherwise specifically provided for etc complete all as specified and as directed Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs)
3
Demolition of un-reinforced cement concrete of any description and in any position not otherwise specifically provided for etc complete all as specified and as directed Please Enable Macros to View BoQ information SCHEDULE OF CREDIT 1. All worn out/unserviceable materials/items which will be obtained from different items of Sch `A’/ BOQ (as mentioned above) during replacement work, shall become contractor’s property and amount of credit shall be recovered from the contractor's RAR & final bill as and when payments are submitted. These materials shall be allowed to be removed from works site only after credit amount for the same is recovered from the contractor’s payment. Items not covered under this Schedule shall become the property of department and the same shall be returned/ deposited by the contractor at MES store yard without any extra cost to department/ government and all materials which are credited to the contractor, shall be recorded in MB 2. The contractor shall have no claim regarding fixation of credit rates in this schedule and no rebate on \\"Schedule of credit\\" rates/ amount shall be accepted. However contractor can offer more credit rates/ amount. 3. The total credit amount may vary as per execution of work above different items involved in this credit schedule. 4. The quantities given in column 4 are provisional and same shall be measured and paid based on actual quantities obtained against relevant items of Schedule ‘A’/ BOQ. These materials shall not be reused/ reincorporated in the work except where specified. 5. The measurements of dismantled materials shall be the gross quantity obtained and not the net quantity considered for payment in schedule. The old and unserviceable materials to be retrieved from taking down/demolition/dismantling etc are considered in schedule of credit. No claim of contractor with regard to quality/position of old materials shall be entertained Srl No Description of item Qty Unit Assessed rate by department Remarks Rate in (Rs) Amount in (Rs)
4
Total amount of credit schedule 0.0 Signature of contractor AGE (Contracts) For ACCEPTING OFFICER
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.