|
| 1 | Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m in depth and not exceeding 10 sqm on plan and getting out in Soft / loose soil etc. complete all as specified and as directed. |
| 2 | Returning, filling in, including, spreading, leveling, watering and well ramming in layers not exceeding 25 cm deep in soil complete all as specified and as directed. |
| 3 | Removing excavated materials to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point in soil including spreading in low lying area and leveling complete all as specified and as directed. |
| 4 | Supply & Laying fixing, connecting and testing steel water tubing, medium grade, galvanised with screwed and socketed joints, in any length, including supply and fixing all fittings,and fixed to wall / ceiling or laid in trenches / floors including taking up or down steel water tubings and connections complete all as specified and directed for 20 mm bore. Make: Jindal / BST / Oswal / Tata |
| 5 | Ditto all as per item No 04 above but 25 mm dia bore complete |
| 6 | Ditto all as per item No 04 above but 40 mm dia bore complete |
| 7 | Ditto all as per item No 04 above but 50 mm dia bore complete |
| 8 | Ditto all as per item No 04 above but 80 mm dia bore complete |
| 9 | Supply and fix in repairs ISI Marked UPVC Pipe of size 50 mm nominal dia, pressure pipe Schedule 80 with all connected acessories like UPVC bend,Tees,Unions,Sockets etc for each 3 mtr length of Pipe & solvent to join it all as specified and as directed.Make: Supreme / Dutron / Finolex / SFMC |
| 10 | Ditto all as per item No 09 above but 40 mm dia bore complete |
| 11 | Ditto all as per item No 09 above but 25 mm dia bore complete |
| 12 | M&L for seven stage cleaning and sterilization of inside the RCC/ Underground/semi underground/Over head/Sedmentation/clear water sumps of capacity UG sump reservoir 2,70,000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Make: rays Cleantech/ Inus watertech/ satya enterprise. Location: SPDC Pump House Seven stages are as under plants:- (a). First Stage is to drain out the water by using exit valve or high capacity dewatering system. (b). Second stage is cleaning all the algae formation inside the tank by using TERBAC G10/ Inoxi-60/NB-69 a laboratory tested branded chemical of the company ans scrubbing the walls of the tanks. (c). Third strage is fresh water cleaning by high speed jet pump. (d). Fourth stage and first bacteria screening is decertification by using TERBAC-G5/ Inohor-5/NB-10 a Govt Laboratory certified brannded halogen compound. (e). Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner. (f) . Sixth stage is the second bacterio screening and sterilizing method by using ultra violet ray within the tnk and kills all suspended bacteria. (g) Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, branded strong oxidizing agent TERBAC-G65/Inoxi-60/NB-69 . Note:-(i) company will submit government laboratory test certificate of terbac-g5/inchor-5/nb-10, terbac-g65/ inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage.) Please Enable Macros to View BoQ information |
| 13 | M&L for seven stage cleaning and sterilization of inside the RCC/ Underground/semi underground/Over head/Sedmentation/clear water sumps of capacity UG sump reservoir 2,70,000 gallons through bacteriological treatment by using TERBAC G5/Inchor-5/NB-10/ TERBAC-G-65/ Inoxi-60/NB-69 AND ULTRA VIOLET RAY. Make: rays Cleantech/ Inus watertech/ satya enterprise. Location: SPDC Pump House Seven stages are as under plants:- (a). First Stage is to drain out the water by using exit valve or high capacity dewatering system. (b). Second stage is cleaning all the algae formation inside the tank by using TERBAC G10/ Inoxi-60/NB-69 a laboratory tested branded chemical of the company ans scrubbing the walls of the tanks. (c). Third strage is fresh water cleaning by high speed jet pump. (d). Fourth stage and first bacteria screening is decertification by using TERBAC-G5/ Inohor-5/NB-10 a Govt Laboratory certified brannded halogen compound. (e). Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner. (f) . Sixth stage is the second bacterio screening and sterilizing method by using ultra violet ray within the tnk and kills all suspended bacteria. (g) Seventh stage of cleaning and third bacteria screening is to sterilize the floor of the water tank by using laboratory certified, branded strong oxidizing agent TERBAC-G65/Inoxi-60/NB-69 . Note:-(i) company will submit government laboratory test certificate of terbac-g5/inchor-5/nb-10, terbac-g65/ inoxii-60/nb-69, before cleaning, fix the sticker mentioning the date of cleaning & name of site and also provide certificate confirming the completion of sterilization of water tanks mentioning the name of station and date of cleaning. All the cleaning & sterilization staffs should be under accidental insurance coverage.) Please Enable Macros to View BoQ information |