| 1 | Complete maintenance of the entire Garden featured having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, ledge, flower, beds foliage creeper etc. including hoeing wedding, pruning, replacement of palnts gap filing, mowing of lawn, grass cutting by lawn moved and brush cutter, removal of garden waste, applying in secticide, pesticide & fertilizer, (Whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as per directed by officer in charge, (cost of good eawrth, manure, fertilizer, insecticide, pesticide will be provided by constractor) and as per direction officers in charge. (Open Space) |
| 2 | Play Ground46864.26X24 = 1124742.24 MonthsSr. No-31 (5) |
| 3 | Open Space111818.61X24 = 2683646.64 MonthsSr. No-31 (6) |
| 4 | Providing profuse watering arrangement for lawn/Park at site to make available for irrigation ie. Diesel engine & Oil etc. RH Pipe/Canvas Pipe & other T&P and carriage Etc. complete. (As per Noida Authority Approved) |
| 5 | Lawn Area39.21X24 = 941.04 Months |
| 6 | Digging of holes in ordinary soil and refilling the same with excavated earty mixed with manure of sludge in the ration 2:1 by volume (2 parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume of manure after reduction by 8%) flooding with water dressing inicuding removal of rubbish and surplus earth if any with all leads and lifts cost of manure sludge of extra good earth if needed to be paid for Separately pit size. |
| 7 | ShrubsSr. No-27 (iii) |
| 8 | Supply & Planting of shrubs, plants height 2-2.5 feet as required by eigineer in charge in 6 X 8' polythene bags or earthen pot fully foliage and well branched free from disease. (As per market rate)approved by GNIDA |
| 9 | ShrubsSr. No-19 (E) |
| 10 | Supply and stacking of well decayed cattle manure site including royalty and carriage up to 5 Km, lead completed. (Cattle manure measured in stacks will reduced by 8% for payment)Sr. No-29 |
| 11 | Supply of chloropyriphos 20% E.C./Lindan 20% E,C. FOR Anti-Termite treatment of plants@2ml/plant in the interval of 01month up to one year i.e.12times in a year hence it comes 0.24ml/per plant. As per market rate)Sr. No-30 |
| 12 | Clearing of Jungle inlcuding uprooting of rank vegetation grass brush wood trees and sapling of girth up to 30cm measured at height of 1.00mtr. Above ground level removal of rubbish up to a distance of 50mtr. Out side the periphery of the area cleared (As per UP PWD SOR item No. 259 (i) (Area Should be clean each and everypoint of time). |
| 13 | Same as above 259(i) above but grass only SOR 259(a) (4 times in a year)27977.00X6 = 167862.00 times |
| 14 | D/I/T/C tube well boring of 150mm dia including all material & Labour complete PVC boring pipe and stainer of make Finolex Kisan /Supreme approved by engineering in charg eof boring 200 feet.Sr. No-49 |
| 15 | S/F Submersible motor pump CRI make of 3 HP fixing and all material and labour complete.Sr. No-50 |
| 16 | Excavation & back filling the trench for PVC Pipe line with all labour T&P etc. complete (size 1.00 x 0.45 x 0.9) as per UP PWD SOR rate.Sr. No-47 |
| 17 | P/F following size fo Finolex makes PVC, pipes 6.0 kg./cm2 with required PVC Standard special confirming to IS codes with latest amendment and lowering the same tranches and laying true to alignment and gradient complete ile the cost of cutting of pipes for making upt to length and making joints i/c cost of socket Plsiochem PV -85 pvr solvent cement complete PVC pipe must the confirming to IS: 4985-2000 with latest amendment Make - Finolex/ Kisan/supreme Industries Ltd. (Rate as per comparative statement Per Rm.) 90mm dia with coupler 6kg/Cm2 Pressure with i/e all PVC Stanared specialsSr. No-48 |
| 18 | Provding and fixing hydrant with all complete. |
| 19 | Prunning, trimming, shaping of trees/shrubs (ht. 15 feet and above) I/C removal of cut materials upto 50mtr. Lead and as per direction of office in charge (Necessary T&P shall be arranged by the contractor) (AR/GNIDA)1843.00X2 = 3686.00 times |
| 20 | Supply of Tractor Trolley with driver and including POL (AR/GNIDA) |
| 21 | Supply of Labour (AR/GNIDA) |
| 22 | Civil work |
| 23 | M-150 Brick work in 1:4 cement & coarsesand 2.20 F.M Mortar in Foundation and plinth including supply of material, labour and T & P etc. Required for proper completion of the work. 3059 (a) |
| 24 | Cement concrete with 4 cm gauge approved stone ballast coarsesand & Cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (As per item sor no-279) |
| 25 | Providing Precast cement concrete Jali 1:2:4 (1) cement:2 coarse sand:4 graded stone aggregate 6mm nominal size), rienforced with 1:6mm dia mild steel wire including centering and shuttering roughening cleaning fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc complete excluding plastering of the jambs sills and soffits with 50 mm thick.......... |
| 26 | DSR-13/5.18.1/P-99 |
| 27 | 40mm thick fine dressed stone flooring over 20mm (average) thick base of cement mortar 1:5 (cement: 5 coarse sand) with joints finished flush. |
| 28 | 12mm cement plaster of mix |
| 29 | 1:6 (1cement: 6 coarse sand) |
| 30 | DAR-18/13.4.2 |
| 31 | Providing wall putty on old surface with approved quality material of berger/J.K/Birla or similar make two coats SOR 2020 662 € |
| 32 | Finishing walls with one coat of water proffing cement paint of approved quality on previously old treated surface with this paint to give an even shade including supply of all material, labour, tool and plant etc SOR2020-662(A) |
| 33 | Same as item 660 but for weather coat (Asian or Burger Brand) |
| 34 | DSR-13/13.61.1/AR |
| 35 | Excavating holes up to 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc. disposing within a lead of 50m and lift upto 1.5mDSR- 18/2.30.1 |
| 36 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level: |
| 37 | 1:4:8 (1 cement: 4 coarse sand: 8 graded stone) |
| 38 | Supply at site R.C.C Standards post/struts/rails/pales of mix 1:1.5:3 (1 cement: 1.5 coarse sand 3 graded stone aggregate 12.5 m m nominal size) with wooden plugs or mm bar nibs wherever required as per direction of Engineer-in-charge (cost of earth works in excavation, concrete works in foundation to be paid separately). |
| 39 | DSR-2013/16.15.1/P- |
| 40 | Fencing with R.C.C Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but end post and corner post shall be strutted on both sides and end post one side only provided with norizontal lines and two diagonals of barbed wire 9.35 Kg. per 100 meters (min) between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I binding wire tied to 6mm bar nibs fixed while casting the post (cost of R.C.C Posts, struts, earth work and concrete to be paid for separately): Payment to be made per metre cost of total length of barbed wire used. |
| 41 | With G.I. barbed wire |
| 42 | DSR-2018/16.18.1 |
| 43 | White Washing with lime to give and even shade. |
| 44 | New work (three or more coat) |
| 45 | SOR-2020-P-671 |
| 46 | Labour Cess and GST will be paid extra as per govt. orders Please Enable Macros to View BoQ information |