| 1 | Supply of Access Points | Supply of Access Points (Dual Band 2x2, WiFi 6 or better powered by PoE/PoE+) with support of minimum 2.95Gpbs wireless speed and must have 01 No. 2.5G RJ45 port with a hardware controller for management of access points, complete with all mounting accessories |
| 2 | Supply of Layer-2 Managed Switch | Supply of 8 x 2.5G Copper Ports and 4 x 10G SFP+ ports Layer-2 PoE+ Managed Switch with min. 240W power budget fully populated with 10G SFP+ Transceiver modules |
| 3 | Supply of Workstation | Supply of Workstation with Intel Core i7 14700 or AMD Ryzen 7 8700G processor, 32GB DDR5 5600Mts RAM, 1TB NVMe M.2 SSD, Intel Q670/AMD Pro 665 Chipset, Preloaded with Windows 11 Professional along with 23-inch 1920x1080 resolution IPS Monitor or higher specification |
| 4 | Supply of Laptop | Supply of 14-inch Laptop with Intel Core Ultra 7 255U or AMD Ryzen 7 250 processor, 16GB DDR5 5600Mts RAM, 1TB NVMe M.2 SSD, Preloaded with Windows 11 Professional. |
| 5 | Supply of PoE Plus Adaptor | Supply of PoE+ adaptors for WiFi Access Points |
| 6 | Supply of 12-port LIU | Supply of 12 ports LIU with LC-LC connectors fully loaded |
| 7 | Supply of Fiber patch cords of 1 mtr length | Supply of LC-LC Duplex single mode fiber patch cords of 1 mtr length |
| 8 | Supply of 23-AWG CAT-6A UTP Cable | Supply of 23-AWG CAT-6A UTP Cable |
| 9 | Supply of RJ45 Information Outlet Boxes | Supply of RJ45 (CAT6A) Information Outlet Boxes |
| 10 | Supply of 8-Port RJ45 Patch Panel | Supply of 8-Port RJ45 (CAT-6A) Patch Panel |
| 11 | Supply of RJ45 CAT-6A Patch Cords - 1 mtr length | Supply of RJ45 CAT-6A Patch Cords of 1 mtr length |
| 12 | Supply of 25mm PVC conduits - ISI Marked | Supply of 25mm PVC conduits - ISI Marked |
| 13 | Supply of Flexible Pipe | Supply of Flexible Pipe |
| 14 | Laying of CAT-6A UTP data cable | Laying of CAT-6A UTP data cable through PVC Conduits/Flexible, existing conduit/pipe on surface/recess/concealed, with connectors, bends, tees, termination etc. |
| 15 | Installation, Testing, Configuration, Training and Commissioning | Installation, Testing, Configuration, Training and Commissioning of entire WiFi system along with provision of all accessories required. Training shall include on the Job operation, configuration, maintenance and system administration training for IT team. |