|
| 1 | Supplying materials at site |
| 2 | OD26946/2026-2027:Supply of Power Fence Energizer of standard make conforming to IEC-60335-2-76-2002 or specification given in Sections 76/Part 2 of IS 302-2-76 (1999)(Safety ofHousehold and Similar Electrical Appliances - Part 2 Particular Requirements -Sections 76 Electric Fence Energizer) of impulse repetition period greater than orequal to 1 second and impulse duration with 500 ohm load less than or equal to 10mille seconds carrying energy of discharged impulse in 500 ohm load of about 5joules and capable of energizing over a distance of 3 kilometers |
| 3 | OD27521/2026-2027:Supply of 12V 275 Watt Silicone terestrial Photo Voltaic module conforming to IEC 6125/IS 14286 solar panel |
| 4 | OD27522/2026-2027:Supply of Lithium-Ion Inverter Battery 12.8V 100Ah |
| 5 | OD26929/2026-2027:Supply of charge controller unit of standard make suitable to control the charging ofthe tubular battery |
| 6 | OD26926/2026-2027:Supply of lightning diverter of standard make having capacity to divert up to 20 KV |
| 7 | OD26934/2026-2027:Supply of intermediate posts having size of 25x25x3mm,2.5 meter long, hot dippedgalvanized to 60 microns T section with holes of 6 mm size in the vertical side at 25cm(AV) interval starting at 2.5 cm from the bottom. |
| 8 | OD26931/2026-2027:Supply of corner posts made of 50mm GI pipe of B class having 50 NB, 2.5 meter longhaving diametrically opposite holes of size 6 mm at 25 cm interval satring at 2.5 cmfrom the bottom |
| 9 | OD26939/2026-2027:Supply of support post to the corner post made of GI pipe 25 NB,B-type 2.5 meterlong along with fastening assembly hot dipped galvanized |
| 10 | OD26942/2026-2027:Supply of HT wire of standard make, 2.59 mm size, high tensile wire with minimum230-300 grams per square meter zinc coating with ultimate tensile strength of 140kg/sq m for use as conducting wire |
| 11 | OD26930/2026-2027:Supply of 14 gauge wire, high tensile, zinc coated for winding the PP reel insulatoretc. |
| 12 | OD26933/2026-2027:Supply of lead out cable-double insulated inner core wire 2 sq.mm hot dippedgalvanized capable of withstanding 15kv voltage for connecting purpos |
| 13 | OD26945/2026-2027:Supply of super strain insulator made of virgin polymer, UV stabilized, fire resistantand suitable to withstand 15kv voltage |
| 14 | OD26924/2026-2027:Supply of intermediate post insulator (PP reel insulator) made of virgin high densitypoly propylene with break down voltage of 15kv |
| 15 | OD26937/2026-2027:Supply of Tension spring made of hot dipped steel of standard make |
| 16 | OD26941/2026-2027:Supply of Wire tighter made of Aluminum-Silicon alloy |
| 17 | OD26940/2026-2027:Supply of joint clamp, zinc coated,60 micron thick |
| 18 | OD26938/2026-2027:Supply of Clamp for fastening conducting wire around posts hot dipped galvanised |
| 19 | OD26943/2026-2027:Supply of warning signs made of long standing polymer sheet of yellow colour withblack lettering |
| 20 | OD26925/2026-2027:Supply of Rope gate set consisting of steel rope of 5 meters along with one superstrain insulator, insulated handle and hook assembly |
| 21 | OD26932/2026-2027:Supply of Earth kit consisting of 1.2 m long SS rod of size 8-10 mm packed withearthing mixture consisting of bentonite clay |
| 22 | OD26928/2026-2027:Supply of Base unit box for housing energizer, battery, charge control unit etc, bodyof which is made of 18-20 gauge metal plate, powder coated provided with stand of 1meter height made of four legs of MS pipe of 25 mm or MS angle of25mmx25mmx3mm or single leg of painted MS pipe of 50mm diameter |
| 23 | OD26936/2026-2027:Supply of digital volt meter |
| 24 | OD26944/2026-2027:Supply of Tool kit consisting of wire tighter rod, double headed spanner, high tensilewire cutter and cutting plyer |
| 25 | Erection of Solar fence |
| 26 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 27 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 28 | OD26923/2026-2027:Aligning the fence in the field as per the direction of departmental officers, clearingthe fence line of all weeds to a width of 1.5 m, fixing the corner posts at anapproximate distance 50 m in pits of size 30 cm x 30 cm x 45 cm in hard soilconsolidated by ramming gravel and jungle stone pieces and supported by supportposts,fixing intermediate posts by hammering the same in to hard earth to a depth of45 cm, drawing the conducting wire through PP reel insulators tied to theintermediate posts using winding wire and stretching to required strength byconnecting the ends to superstarin insulators tied to the corner posts in 5 strands, thebottommost line at an average height of 15 cms from the ground and the other strandsat approximate intervals of 20 cm, 25 cm, 30 cm, and 40 cm, connecting conductingwire in every strand across each corner post by means of jointing clamps ,fixing wiretightener in every strand at approximate interval of 200 m, connecting tension springin the topmost two conductors at approximate interval of 200 m, providing floodchain set and flood control unit at rivercrossing points, connecting super earth kit tothe earth conductor by means of lead out cable and jointing clamp, fixing verticalconducting wire in the forest side of the fence supported by semicircular conductingwire loop fixed to the conducting wire strand by means of joining clamp forprotecting the post from wild animals, providing gate assembly at places as decidedby the departmental officers by means of rope gate set fixed to corner posts acting asgate posts by means of superstrain insulators at the fixed end and conducting hook atthe detachable end, providing line connection at the gate point through lead out cablelaid underground and energizing the live conductors of the fence by means of theenergiser fixed at suitable locations at approximate distance of 2 km along the fence,connected to the live wire earth wire by means of lead out cable providing sufficientnumber of earth kits in the line to the earth wire, connecting the tubular battery to theenergizer through lead out cable and connecting the solar panel to the battery bymeans of 2 core wire through charge control unit and fixing lightning diverter in thecircuit at appropriate location to protect the energizer from lightningvoltage,providing and fixing stand for the solar panel and metallic box for safestorage of energizer and battery, testing the circuit for required current and voltageand commissioning the fence installation. |
| 29 | TESTING |
| 30 | OD27270/2026-2027:PROVISION FOR TESTING AND CERTIFYING SOLAR FENCE AS PER GUIDELINES FROM CONCERNED AGENCY OR DEPARTMENT Please Enable Macros to View BoQ information |