|
| 1 | Maintaining cleanliness by collection, removal, cleaning and disposal of all types of metal swarf, scrap, metal chips, wastes from forgings, sheet metal waste, steel fabricated frames, pipes tins and similar wastes. The above wastes should be collected not only from the swarf bins / locations but also from surrounding areas of different shops / blocks of factory and transported carefully by loading in a truck/ tractor and disposed of at the earmarked places inside factory by unloading etc, all complete as per specifications & directions of Engineer-in-charge. | Maintaining cleanliness by collection, removal, cleaning and disposal of all types of metal swarf, scrap, metal chips, wastes from forgings, sheet metal waste, steel fabricated frames, pipes tins and similar wastes. The above wastes should be collected not only from the swarf bins / locations but also from surrounding areas of different shops / blocks of factory and transported carefully by loading in a truck/ tractor and disposed of at the earmarked places inside factory by unloading etc, all complete as per specifications & directions of Engineer-in-charge. |
| 2 | Maintaining cleanliness by collection, removal, cleaning and disposal of : (a) Polythene sheets, covers, plastic trays & containers tins and similar items. (b) Cotton wastes, card board sheets, paper, wooden boxes, wood and similar wastes etc. (c) General garbage, organic wastes, including cut grass and vegetations etc.The above wastes should be collected not only from the dust bins/locations but also from surrounding areas of different shops/blocks of factory and transported carefully by loading in a truck/ tractor and disposed off at the earmarked places inside factory by unloading as per the above special notes etc, all complete as per specifications & direction of Engineer-in-charge.(One trip means one full truck load whose body capacity (volume) shall not be less than 06 cubic meter.) OR (One trip means two full tractor load whose body capacity (volume) shall not be less than 03 cubic meter.) etc. all complete as per direction of Engineer in charge. | Maintaining cleanliness by collection, removal, cleaning and disposal of : (a) Polythene sheets, covers, plastic trays & containers tins and similar items. (b) Cotton wastes, card board sheets, paper, wooden boxes, wood and similar wastes etc. (c) General garbage, organic wastes, including cut grass and vegetations etc.The above wastes should be collected not only from the dust bins/locations but also from surrounding areas of different shops/blocks of factory and transported carefully by loading in a truck/ tractor and disposed off at the earmarked places inside factory by unloading as per the above special notes etc, all complete as per specifications & direction of Engineer-in-charge.(One trip means one full truck load whose body capacity (volume) shall not be less than 06 cubic meter.) OR (One trip means two full tractor load whose body capacity (volume) shall not be less than 03 cubic meter.) etc. all complete as per direction of Engineer in charge. |
| 3 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to earmarked dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead (Minimum) and for all leads upto 1.5 Km (Maximum distance) including all lifts involved(One trip means one full tractor load whose body capacity (volume) shall not be less than 03 cubic meter) etc. all complete as per direction of Engineer in charge. | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to earmarked dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead (Minimum) and for all leads upto 1.5 Km (Maximum distance) including all lifts involved(One trip means one full tractor load whose body capacity (volume) shall not be less than 03 cubic meter) etc. all complete as per direction of Engineer in charge. |
| 4 | Earth work in excavation for all kinds of soil by mechanical means (Hydraulic excavator) / manual means over areas including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | Earth work in excavation for all kinds of soil by mechanical means (Hydraulic excavator) / manual means over areas including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. |