| 1 | Dewatering work before digging by 10 HP Diesel pump set with operator &P.O.L. (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 2 | Site clearonce (Cutting of behya / Sarpat gondi / elephant grass and other weeds. (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 3 | E/work Excavation by heavy machine (85%Qty. of grand total) like pocclain, JCB etc. including shifting by tractor trolly of earth at embankment of pond (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 4 | E/work Excavation of pond for proper cutting and disposal of bund.(15% qty of grand total E/W) And Extra for Haed Earth Mixed With Kanker which can be excavated by pick axe or crow bar only an As per I.D. chaper v-A sl.no. 3(d) and si 16 (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 5 | Extra manual compaction in embankment above 1.5m height of bund ID ch-v-A Sl. -7(i) (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 6 | Extra for bund dressing ID Ch-v-A Sl no-19 (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 7 | Earth work in Strengthening bank of canal / dam/ Bandhies / Roads by Porclain/JCB machiens including partical copaction in layers withntial lead and lift of 0.50m each ain all type of soils with disposal as directed By site incharg .Ch.5 A item no.5 (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 8 | Earth work in Excavation foundation of Ramp, Inlet and Outlet in ordinary soil / sandy loam , clay of sand lift upto 1.50m and lead upto 30.00m and including filling watering ramming of excavated soil into the trenches or upto the space and sides on the foundation trenches or into the plinth and removal and disposal of surplus soil as directed by Engineer in charge. (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 9 | C.C in 1:3:6 cement,coarse sand,stone ballast (25-50 mm)including cost of material at site labour,T&P etc required for proper completion of work.Making Ramp, Inlet and Outlet. (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 10 | Brick Masonary work 1:4 Cement& Coarse sand mortar.Making Ramp,Inlet and Outlet. (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 11 | Deep struck / raised Pointing on brick masonry struk deep with 1:2 cement mortar. (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 12 | CC work in 1:2:4 with cement, coarse sand and 20mm stone grit .Making Ramp, Inlet and Outlet (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 13 | Dry brick on edge pitching including preaparation of sub grade and filling joints with local sand.Making Ramp (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 14 | S/F of RCC Hume pipe NP3 900mm dia (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) |
| 15 | S/F of Shila patt (Including all material, T&P, royalty, labour cess etc. but excluding G.S.T.) Please Enable Macros to View BoQ information |