|
| 1 | Clearing of heavy jungle including uprooting stumps of trees and trees above 1m girth and thick bushes including bamboo on premeasurement and deposing the debies away form the work site with all lead, lift and delift including all labour, cess, T&P, taxes of all materials excluding GST, as required for the work etc compelte as per direction of the Engineer incharge. |
| 2 | Clearing of thickly grown water hyacinth from drainage channels on premeasurement and deposing the debies away form the work site with all lead, lift and delift including all labour, cess, T&P, taxes of all materials excluding GST, as required for the work etc compelte as per direction of the Engineer incharge. |
| 3 | Clearing of moderately grown water hyacinth from drainage channels on premeasurement and deposing the debies away form the work site with all lead, lift and delift including all labour, cess, T&P, taxes of all materials excluding GST, as required for the work etc compelte as per direction of the Engineer incharge. |
| 4 | Excavation in any approved type soil in approved borrow area by Mechanical means loading into and transportation by mechanical means and unloading soil with all leads, lifts and delifts on properly prepared and scientifically approved surface to the designed section. Clean from weeds and roots including spreading and leveling the earth in 22.5 cm layers as per the approved profile of canal to line and grade breaking clods to max. 5 to 7 cm including cost, conveyance of earth hire and running charges of transport vehicles, maintenance of haul road and approach road, taxes of all materials excluding GST etc. complete as per specification and direction of the Engineer in charge. ( Measurement to be taken on finished compacted section of the fill basing on initial and final levels). |
| 5 | Excavation of canal / drain in both wet & dry condition by Mechanical means in all kinds of soil including slushy soil requiring the aid of pans. and vessels, rough dressing and leveling the excavated canal / drain slopes and bed to design section and depositing the excavated materials in spoil bank or to any other specified area to proper section with all leads, lifts, delift, handling, rehandling and dewatering etc. complete including construction and maintenance of approach road, diversion road, coffer dam, taxes of all materials excluding GST but including cess, T&P etc. including mobilization and demobilization of men and machineries etc. complete with all cost incidental to the work as per the drawing, specification and direction of the Engineer-in-Charge. Measurement will be made as per finished level section. |
| 6 | Providing and laying cement concrete M15 in approved surface using 20 mm down graded size crusher broken hard granite free from weathered skin surface and any other deleterious materials, using sharp sand of approved quality conforming to the specifications, using water of approved quality and using cement as per approved specification with all leads, lifts, delifts and transportation by mechanical / manual means including cost, carriage, royalties, EMF, DMF, Additional charges, T&P, cess and taxes of all materials excluding GST and dewatering by suitable means with all cost, mixing the concrete mix ingredients in all mechanical mixer, vibration of concrete by mechanical means, watering, curing for specified days by suitable means including cost and carriage of water, construction of coffer dam / approach road, diversion road, mobilization and demobilization of men and machineries etc. including quality control testing charges as per approved drawings and specifications and direction of the Engineer-in-Charge. Please Enable Macros to View BoQ information |