| 1 | Earthwork in excavation in foundation in all kinds of soil within initial lead of 50m. and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge. |
| 2 | Providing and Laying of bored cast-in-situ M35 grade R.C.C. Pile of 1200 mm dia etc complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. etc. |
| 3 | Providing and laying Steel liner of 8 mm thick in pile including Fabricating and setting out as per detailed drawing. |
| 4 | Sinking of steel liner plate for pile including cost of all labour & machinery etc complete as per specification & direction of the Engineer in charge. |
| 5 | Reinforced Cement Concrete M 35 Grade using 20mm down graded chips in superstructure (Pier Cap) |
| 6 | Supplying, Providing & laying reinforced cement concrete M-15 grade (cast-in-situ) as per design mix prepared under relevant IS/IRC codes concrete using graded crushed stone aggregate, cement and coarse sand of approved quality and quantity in wing walls, retain walls & curtain walls as levelling course using weigh batching, mechanically mixing, vibrating, centering & shuttering, decentering secured tools & plant equipments & including all inclusive costs, all operations, contingencies incidentals involved for the finished defect free items of work complete to satisfaction but excluding cost of reinforcement complete as per drawing and technical specification Part I/II under section 1500,1700 & 2100 of MORTH specification for Road & Bridge works (4th revision) and as directed by Engineer or his representative full satisfaction.Providing PCC M15 as leveling coarse below pile caps & as per section no.1500,1700 & 2100 of Specification for road & bridge work MoRT&H (4th revision) |
| 7 | Reinforced Cement Concrete M 30 Grade using 20mm down graded chips in superstructure (Abutment & Pier Shaft) |
| 8 | Abutment & Pier Cap |
| 9 | Dirt walls |
| 10 | Wearing Coat-Mastic Asphalt |
| 11 | Approach Slab |
| 12 | Deck Slab |
| 13 | Reinforced Cement Concrete M 40 Grade using 20mm down graded chips in superstructure (RCC Crash Barrier) |
| 14 | Straightening, cutting, bending binding M/S or T.S. rods and placing in position etc. complete |
| 15 | Providing and laying of Filter media with stone crushed aggregates of 45 mm size satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wingwall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specifications. |
| 16 | Providing weep holes in Brick masonry / Plain / Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. |
| 17 | Rough stone dry packing in approns and revetments with hard granite stone (30 cm & above) including cost of all materials etc complete |
| 18 | Providing & back filling of specified materials behind abutment, wing wall and return wall complete as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 & 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. GRAVEL BACKING |
| 19 | b) Sandy Material |
| 20 | Providing and fixing R.C.C. of grade M-20 in guard posts of 1200mm height and 15 cm diameter using steel reinforcement @ 4% of volume of concrete including cost of steel reinforcement for finished item of work as per approved drawing and technical specifications complete in all respect as per Section 800, 900, 1000, 1500, 1600 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 21 | Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and vertical movement of 3 mm. |
| 22 | Providing Cement Concrete (1:3:6) etc complete |
| 23 | Providing ,fitting, fixing of drainage spout with C.I. grating to holes in deck slab including cost & taxes etc. |
| 24 | Providing and applying two coats of Enamel paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescense and applying paint @ 1 litre per 02 Sqm |
| 25 | Providing, fitting & fixing of SBY Information board |
| 26 | M10 for Toe wall foundation base |
| 27 | M15 for Toe wall |
| 28 | Construction of embankment with approved material obtained from borrow pits with all liifts and leads, transporting to the site by mechanical means within a lead of 05kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & clause 305 of MoSRT&H specifications for Road & Bridge works (04th Revision) |
| 29 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in table 300-1 & 300-2 for embankment construction & as per clause 305 of MoRT&H specifications for road & bridge works(5th revision) and as per direction of the Engineer-in-Charge. |
| 30 | Providing & construction of Granular subbase by providing crushed stone close graded materials of Grading-III as per table 400-1, spreading in uniform layers on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with vibratory power roller to achieve the desired density complete as per Clause-401 of MoRTH specifications for Roads & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 31 | Providin, laying, spreading & compacting graded stone aggregate to Wet Mix Macadam specification including pre mixing the material with water at OMC in mechanical mix plant/pugmill, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on well prepared surface & compacting with vibratory roller to acieve the desired density as per clause 406 of MoRTH specifications for road & bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 32 | Providing and applying primer coat on the prepared surface of granular base with slow setting bitumen emulsion (Grade S.S.-1) as per approved drawing and technical specifications Section 900 and Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 33 | Providing and applying tack coat on the prepared bituminous surface including cleaning with mechanical broom spraying @ 0.30kg/sqm with rapid setting bitumen emulsion (Grade R.S.-1) as per approved drawing and technical specifications as per Section 900 and Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of the Engineer-in-Charge. |
| 34 | Providin & laying Bituminous Macadam with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of viscosity grade bitumen of VG-30, transported to site, laid over previously prepared surface with hydrostatic paver finisher with sensor control to the required grade, level & alingment & roling with smooth wheeled,vibratory & tandem rollers to achieve the desired compaction as per clause 501.5.2 & 504 of MoRT&H Specifications for road and bridge works (5th Revision) as per direction of the Engineer-in-Charge. |
| 35 | Providing and laying compacted Semi Dense Bituminous Concrete (Grading-2) with Batch type Hot Mix Plant using crushed stone aggregates of specified grading, premixed with bituminous binder of viscosity grade of bitumen of VG-30 transporting the hot mix to work site, laying with a hydrostatic paver finisher (with sensor control ) to the required grade, level and alignment, rolling with smooth wheeled, vibtratory and tandem rollers to achieve the desired compaction as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501 & 507 of MoRT&H Specifications for Road & Bridge works (4th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of the Engineer-in-Charge. |
| 36 | Fine dressing &Turfing with all leads & lifts and placing of turfs in position and ramming with thapies including watering and cost of labour & all materials, Cess etc. complete as per Clause 307 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge. |
| 37 | Earthwork in excavation in foundation in hard soil within the initial lead and lift including rough dressing and breaking clods to maximum 5cm to 7cm andlaying in layers not exceeding 0.3 mtr in depth etc complete as per the direction of the Enngineer in Charge. |
| 38 | Filling in Foundation Trenches with sand as per drawing and technical specification and as per the direction of the Engineer-in-charge. |
| 39 | Providing laying R.C.C. Hume pipe NP3 class for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection work, backfilling,concrete and masonry work in head walls and parapets clause 1106 of MORD specification for Rural roads and as per irection of Engineer-in charge. |
| 40 | Plain cement concrete M-15 grade in Sub-Structure complete as per drawing and technical specification. Please Enable Macros to View BoQ information |